Laserfiche WebLink
8.B. - Page 3 <br /> ANALYSIS <br /> Staff evaluated and analyzed the proposed CIP budget from the perspective of project <br /> delivery, including timing of project phases. Where appropriate, amounts for the project <br /> planning or design phases are shown in different fiscal years within the Five Year Plan. <br /> Additionally, programs are evaluated from the perspective of adjoining or related <br /> projects, as appropriate. For example, ongoing infrastructure maintenance may be <br /> timed to coincide with new development, to minimize disruption. As a result, these <br /> ongoing program expenditures may be less linear than in prior years. Also, more <br /> emphasis is placed on funding projects that are ready for construction. This helps <br /> ensure that funds are utilized in a timely manner while also reducing the need to <br /> accumulate funds and carry balances forward from year to year. <br /> In FY 2014-15 through FY 2016-17, projects are included for which funding is <br /> anticipated but not yet confirmed. Anticipated funding includes potential cost sharing, <br /> bond financing, and fees provided by private developers. This anticipated funding is <br /> included in the projected revenue subtotal, and is then subtracted from the net fund <br /> balance. If these outside funding sources do not materialize, projects would either be <br /> rescheduled to subsequent years, re-scoped to fit within available funds, or cancelled. <br /> Major projects that are being added or amended in the budget include: <br /> New proiects <br /> • Redwood Creek Channel Improvement: A study was completed in 2012 to <br /> assess deficiencies along the 8 mile creek system. $500,000 is programmed for <br /> FY 2013-14 for permitting and design of the repairs and construction to take <br /> place in the following years. This will be a multi-year project, so the repairs will be <br /> done as funds become available. <br /> • Stulsaft Park Retaining Wall: $200,000 is programmed in FY 2013-14 for <br /> permitting and design of the retaining wall for the access road in the park. <br /> Construction is planned for the following year. <br /> • Roosevelt Street Undergrounding of Utilities Phase III: $500,000 is budgeted in <br /> FY 2013-14 to establish the undergrounding district and design for Roosevelt <br /> Street between Valota Road and Upton Ave. Construction with an estimated <br /> budget of $3,000,000 is planned for FY 2016-17. <br /> Previously authorized proiects <br /> • Walnut Street/101 Interceptor Replacement Sewer: This will improve the <br /> reliability of sewer transmission across 101 by adding a 60-inch line. In the <br /> current adopted budget the project was planned for construction in FY 2014-15. <br /> Since funding is available in the Sewer Enterprise fund, this project is now <br /> planned for construction in FY 2013-14. Funds previously programmed in FY <br /> 2014-15 ($2.5 Million) are now planned in FY 2013-14. <br /> • The planned construction for the replacement of Fire Station 12 with a Redwood <br /> City/ San Carlos/ County combined-use facility has been delayed another year <br />