My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-04-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2013 4:33:22 PM
Creation date
4/18/2013 5:01:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 4 <br /> due to lack of a suitable site. $250,000 is programmed in FY 2013-14 for site <br /> selection and environmental study. An estimated construction cost of $5,000,000 <br /> is now programmed in FY 2015-16. <br /> • The Bayfront Canal Storm Retention Improvement Project, to pipe storm water to <br /> the National Wildlife Refuge Wetland Restoration area for both beneficial wetland <br /> restoration and storm water retention: This $2 million effort will begin once the <br /> Restoration Project has completed its environmental review, which will include <br /> this planned project as part of its analysis. A grant request for $1 Million has <br /> been submitted for Proposition 84 funding. Design is anticipated in FY 2014-15 <br /> after the grant award and completion of environmental review. <br /> • Redwood Shores Lagoon Dredging Phase II: Initial dredging of the lagoon was <br /> done in 2009, however it could not be completed due to the lack of funds in last <br /> year's adopted budget. Completion of this project is planned for next year and <br /> $1.5 Million is programmed in FY 2013-14. <br /> • Increased budget for the sewer system: Additional funding for the Collection <br /> System Replacement Program ($195,000), Sewer Rehabilitation Program <br /> ($190,000) and the CCTV Program ($115,000) is programmed in FY 2013-14 to <br /> catch up with the deferred maintenance of aging pipes. <br /> • Increased budget for the water system: Funding for construction of the California <br /> Tank and Pump Station construction ($3,000,000) and Carson Tank <br /> Rehabilitation ($1,000,000) have been programmed in FY 2013-14. These <br /> projects were previously programmed for FY 2014-15 and FY 2015-16, <br /> respectively; however they are high priority projects in the water master plan and <br /> are ready for construction in FY 2013-14. An additional $250,000 is proposed for <br /> the Water Distribution Replacement Program to catch up with the deferred <br /> maintenance of water mains. <br /> • Increased budget for the transportation program: $515,000 has been reallocated <br /> to the Roadway Management Program in FY 2013-14 from the accumulated <br /> balance in Gas Tax Construction Fund and other projects. This additional funding <br /> is necessary to increase the number of streets to be resurfaced to keep up with <br /> the deferred maintenance. <br /> ALTERNATIVES <br /> Council may choose to reprioritize proposed funding and/or make other adjustments. <br /> FISCAL IMPACT <br /> The proposed CIP budget totals $27,279,944 for FY 2013-14. <br />
The URL can be used to link to this page
Your browser does not support the video tag.