Laserfiche WebLink
�It`r " 'It �$ �w�:`all � '.1.�11 <br /> II�'�'�"�'�ukwr���hl�."�� �'��!�����m� ��` ��`i ,� `i��n��.�°���' '�o'�'����;�'IN�, <br /> �4 Construction Mortitoring <br /> 14.1 The Pro�ect Arbarist shouid make monthly site inspectioRS to verify that tree <br /> protection measures are maintained. <br /> �4.2 Work within the TPZ of trees is to be authorized and manitored by the Project <br /> Arborist. <br /> 14.3 The Praject Arborist is to submit by email a written report of ttis/her findings <br /> and recommendations to the contact designated by the owner. <br /> 75 Post ConStruction Care <br /> 15.1 Trees preserved at the constructian site wil! experience a physical <br /> enviranment different from that of pre-de�elopment. As a result, tree health <br /> and structural stability should be r�onitored. OccaSional pruning, fertilization, <br /> mulch, pest management and irrigation may be required. These trees may <br /> require pruning on a 5 to 7 year cycle. <br /> 15.2 Qualified Tree Contractar <br /> �5.2.1 Ali tree work is to E�e per�ormed by a State of California Licensed Tree <br /> Contractor (C6y - D49) who can pravide proof of insurance (Genera! <br /> liability and Workers Compensation) <br /> 15.2.2 Ail pruning is to be perFormed ar directed by a Certified Arborist or a <br /> Certified Tree Worker. <br /> 15.2.3 All tree work is to be campleted in accordance with the Best <br /> Management Practices for Pruning (IntErnational Society of <br /> Arboriculture) and adhere to the most recent editions of the Americar� <br /> National Standards Institute (ANSI} for Tree Care Operations (Z133.1) and <br /> Pruning (A3�0). <br /> azii 2 <br /> u�l���"����'i����x�'��"�"i,�d,�„°� �G�a a M P"��^''�r'I��1"rv",w��'i�"M II "ipl� <br />