Laserfiche WebLink
6.1. B. - Page 6 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> The scope of the agreement is expanded to include the following for Mezes and <br /> Jardin de Ninos Parks Project: <br /> Task B - CONSTRUCTION DOCZJMENTATION <br /> Mezes Park Additional Scope <br /> Consultant shall: <br /> 1. Provide updated construction drawings to include the following additional <br /> construction details: <br /> a. Added central path <br /> b. New Howland Street path & planting <br /> c. Bioswale <br /> d. Post & rail fencing <br /> e. ADA ramp in play area <br /> f. Irrigation updates <br /> 2. Update Utility Plans <br /> a. Adjust reclaimed water & domestic water lines <br /> b. Update Construction Sheet: <br /> i. C1.0 Utility Plan <br /> 3. Update Sanitary Sewer & Storm Drain Plans <br /> c. Modify existing storm drain system to accommodate new sanitary sewer <br /> line <br /> d. Provide 8.5x11 Demo & Improvement diagrams <br /> 4. Update Site Layout Plan <br /> e. Layout of paths/proposed hardscape <br /> f. Replace turf with bark mulch <br /> g. Adjust light pads & location of 3 lights <br /> h. Update bioswale & adjust drainage <br /> i. Update proposed improvements to tank <br /> j. Revise grading plan <br /> k. Update Construction Document Sheets: <br /> i. L1.1 Demolition Plan <br /> ii. L2.1 Grading Plan <br /> iii. L3.1 Construction Plan <br /> iv. L4.1 Layout Plan <br /> v. L7.1 Planting Plan <br /> 1. Update details: <br /> i. 3/L5.2 Mow Band at Tank <br /> ii. 4/L5.2 Bioswale <br /> iii. 6/L5.2 Concrete Curb (new detail) <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 2 ROYSTON, HANAMOTO, ALLEY & ABEY Page 3 of 6 <br /> REV: OS-23-13 VR <br />