My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-06-10 Interview Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-06-10 Interview Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:11:42 PM
Creation date
6/6/2013 5:02:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. B. - Page 7 <br /> Jardin de Ninos Park Additional Scope <br /> Consultant shall: <br /> 1. Provide additional details as listed below: <br /> a. DG path & retaining wall at garden <br /> b. Tree wells in play area <br /> c. Artificial turf rather than wood chip <br /> d. Irrigation upgrades <br /> 2. Attend 2 additional community outreach meetings <br /> 3. Submit 95� construction drawings and specifications <br /> 4. Submit 100� construction drawings and specifications <br /> 5. Submit bid set documentation <br /> a. CAD file <br /> b. PDF <br /> fiask C- BID AND CONSTRUCTION SUPPORT <br /> Jardin de Ninos Bid Support <br /> Consultant shall: <br /> 1. Respond to questions (RFI's, clarifications) during the bid process <br /> 2. Assist with preparation of addenda, as needed <br /> Task D - CONSTRUCTION ADMINISTRATION <br /> Jardin de Ninos Construction Administration <br /> Consultant shall: <br /> 1. Respond to RFI's & questions with ASIs <br /> 2. Site Visits/Meetings <br /> a. Due to the changes made during the construction administration <br /> phase, it is recommended that an additional meeting be held to <br /> review as-built documents prior to RHAA preparing. <br /> 3. Prepare Record Drawings <br /> a. Due to the changes made during the construction administration <br /> phase, it is anticipated that a greater extent of as-built work will <br /> be needed to update the drawings as listed below. <br /> i. L6.2 Irrigation Plan. Update irrigation per City adjustments <br /> & added turf field. <br /> ii. C1.0 Utility Plan Water & Sewer Updated base background. <br /> iii. E1.1 Electrical Plan & Details. Update base background & <br /> light pole locations. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 2 ROYSTON, HANAMOTO, ALLEY & ABEY Page 4 of 6 <br /> REV: 05-23-13 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.