My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-06-24 Closed and Joint Amended 06-21_2013
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-06-24 Closed and Joint Amended 06-21_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 3:46:24 PM
Creation date
6/20/2013 5:41:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/24/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.4.B. - Page 2 <br /> costs is $200 million. Additionally, the proposed rate increase will continue to support <br /> the ongoing repairs and replacement of the City's sewer collection infrastructure, which <br /> is projected to cost over $100 million over the next 10 years. <br /> The City's proposed rate increase is based on revenue required to meet the increasing <br /> costs of service and SBSA infrastructure projects, and is contained in the updated <br /> Sewer Enterprise 10-Year Financial Plan and Rate Study prepared by the independent <br /> public finance advisory firm Bartle Wells Associate (copy of this study is on file in the <br /> City Clerk's Office). <br /> Based on direction given by the Utilities Committee, staff recommends increasing the <br /> basic monthly sewer service charge as follows: <br /> Residential Sewer Customers <br /> Current Proposed Proposed Proposed Proposed <br /> Monthly Rate Monthly Rate Monthly Rate Monthly Rate Percentage <br /> as of August as of July 1, as of July 1, Increase <br /> 1, 2013 2014 2015 <br /> $57.88 $63.09 $68.77 $74.95 9% per year <br /> Commercial Sewer Customers <br /> The Commercial sewer charge consists of two parts. A minimum monthly charge and a <br /> metered usage charge. The minimum monthly charge equals the residential Basic <br /> Service Charge. The proposed minimum monthly rate increases are as follows: <br /> Current Proposed Proposed Proposed Proposed <br /> Monthly Rate Monthly Rate Monthly Rate Monthly Rate Percentage <br /> as of August as of July 1, as of July 1, Increase <br /> 1, 2013 2014 2015 <br /> $57.88 $63.09 $68.77 $74.95 9% per year <br /> The metered sewer charges vary by customer class, or type of business, as shown <br /> below. Charges are calculated by multiplying each customer's rate by their metered <br /> water use during the billing period. The metered rate is based on wastewater discharge <br /> into the sewer system after the first one thousand (1,000) cubic feet for a billing cycle - <br /> each unit of ineasure equals one hundred (100) cubic feet. The following table shows <br /> the sewer rate proposed for commercial customers based on the rate applicable to each <br /> customer class multiplied by the amount of inetered water use per billing period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.