My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />..,.,,~;,~,':".. ,.,"" ',,- <br /> <br />-' . ' <br />-',- <br /> <br /> <br />EXHIBIT A <br />DISTRIBUTION OF CAPITÄL COSTS FOR S~AGE 1 OF'THE P~OJECT <br /> <br /> <br />Capital Cost Distribution as a Percentage <br />of Final Total Costs <br /> <br />Item Description Belmont San Carlos Redwood City ~ <br /> <br />1. Menlo Park Pumping Plant & <br />Force Main to Redwood City 0.0 0.0 0.0 100.0 <br /> <br />2. San Carlos Outfall from <br />Existing Pumping Plant to <br />New ,pumping Plant 0.0 100.0 0.0 0.0 <br /> <br />3. New San Carlos Pumping <br />Plant 0.0 2l.0 6.5 72.5 <br /> <br />4. Redwood City Meter & Pump- <br />ing Plant Modifications 0.0 0.0 100.0 0.0 <br /> <br />S. San Carlos Metering <br />Facilities 0.0 100.0 0.0 0.0 <br /> <br />6. Belmont Standby Power, <br />Pumping Plant Modifications <br />& Outfall Connection 100.0 0.0 0.0 0.0 <br /> <br />7. Subregional Treatment Plant <br />at Redwood Shores 10.9 18.0 45.7 25.4 <br /> <br /> <br /> <br /> <br /> <br /> <br />Note: 1. Capital costs include readily identifiable costs <br />of construction, including engineering design, <br />construction supervision and change orders during <br />construction. Costs of special services, including <br />soils studies, surveys, rights-ai-war, le9al and adminis- <br />trati~e expenses and preliminary engLneer1ng <br />(including reports), are not included. <br /> <br />2. Costs of special services described in Note 1 <br />above shall be distributed in accordance with <br />each Agency's percentage of the total costs of <br />constructing all of Stage 1 of the Project. In <br />equation form this would be as follows: <br /> <br />Agency percentage of special services costs = <br /> <br />Agency Capital Costs <br />Total Costs of Stage 1 of the Project <br /> <br />3. The percentages set forth above are based on actual <br />costs, exclusive of any State and/or Federal grants <br />received. Should any such grants be received <br />prior to, during, or after the completion of con- <br />struction, they shall be returned to each of the <br />Agencies, in accordance with the rules and regu- <br />lations which govern at the time af receipt af <br />such grants. <br /> <br />1005061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.