My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_. AFS:djg-c 2/21/84 <br /> - � ' '� =•���S:djg-c 3/05/84R <br /> DES:djg-c 3/12/84R <br /> ,--�. <br /> � Project. The ina.tial pot�ntial treatment capacity rights of the <br /> respective Agencies to the capacity proposec� to be constructed and <br /> established for each Substage of Stage 2 of the Project shall be <br /> allocated in proportionate shares equivalent to the proportionate <br /> ownersYtip of each such Agency to the capaci�y rights for Stage 1 <br /> af the Project. Said capacity righ�.s shall be expre�sed in <br /> gallons per day volume of Average Daily Dry Wea�her Flow, for each <br /> of which there shall be cerresponding cancentrations of <br /> Biachemical Oxyger_ Demand and Suspended Solids of 325 milligrams <br /> pe� liter (Mg/L) day, each. <br /> "G?ith the prior written approval af the Commission, <br /> any Agency may relinquish to any other Agency any portzon of <br /> � its i.nitial potential capacity rights as agreed upon by <br /> � said two Agenci�s prior to cammencement of construction of any <br /> such Subs�age. Thereupon the Agency so abtaining such <br /> relinquished riqhts shall be entitled t� obtain maximum capacity <br /> rights equal to the sum of its initial rights plus its acquired <br /> rights. <br /> "With respect to Substage 1, the respective'capacity <br /> rights of the Agencies shall accrue upan canstructi.on thereaf; <br /> provided, however, that each Agency shall reimburse the Authority <br /> according to its respeative allocated share of the costs of <br /> construction thereof based upon its respective proportionate <br /> ownership of capacity rights pursuant to Subdivision ib) of <br /> Section 5.6 prior to acquir,ing any further capacity rights. With <br /> � respect to Substages 2-4 , incZusive , no such rights shaJ.I accrue <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.