Laserfiche WebLink
T�ES:djg-c 2/21/84 <br /> - � ;S:djg-c 3/05/84R <br /> ' L�S:djg-c 3/12/84R <br /> � until advanc� fu1Z paymer,t therefc�r has been made, and the <br /> corresponding Substage. has been construct�d pursuant to <br /> Subdivision {b) of Section 5.6. In the event any ane� or more <br /> than one, of Substages 2-4 is or are not so constructed, all <br /> potential capacity rights pertaining thereto shall terminate, and <br /> any payments therefor shall be disposed of in accardance with said <br /> Subdivision (b) af Sectian 5. 6 . <br /> "Wastewater system connection permits or other forms of <br /> entitlement to use t�eatment capacity within the limits of the <br /> maximum capacity riqhts allocated to each Agency shall conform ta <br /> the tinancing requirements for each Substage of Stage 2 of the <br /> Project as provided in Subdivision (b) of Sec�ion 5.6. Such <br /> � permits or entitlements issued ta wastewater system users shall <br /> not be transferable except between owners of the land for which <br /> they were issued; provided, however, that each Agency may require <br /> that such permits or entitlernents and the capacity rights <br /> pertaining thereto shall expire far non-use within a specified <br /> term followinq the operative date of the �ubstage to which they <br /> pertain and that upon sucn expiratian all treatment capacity ' <br /> rights thereunder revert ta the issuing Agency. No treatment <br /> capacity rights for any Substage of Stage 2 of the Project shall <br /> xevert, or be relinquished to, or be acquired by, the Authority; <br /> . provided, however, that inter-Agency transfers may be made subjec� <br /> to Commission approval as hereinabove and in Section 7. 3 <br /> provided." <br /> � " (c) Limitations Exceeded. I€ the Antharity shall <br /> 16 <br />