Laserfiche WebLink
, • _ - F""��:djc 8/15/85 <br /> Y n <br /> � � °. L.�S:djc 9/09/85R <br /> '' � � ' ' DES:djc 9/18/85R <br /> Subdivision (b) of Section 5.6. In the event any one, or mare <br /> � than one, of Substages 2-4 is or are not so constructed, all <br /> potential capacity righfs pertaining thereto shal]. terminate, and <br /> any payments therefor sha11 be disposed of in accordance with <br /> said Subdivision (b) of Section 5.6. � <br /> "Wastewater system cannection permits or other forms af <br /> entitlement to use treatment capacity within the limits of the <br /> maximum capacity rights allocated to each Agency shall confarm to <br /> �.he financing requirements for each 5ubstage df 5tage 2 of the <br /> Project as provided in Subdivision (b) of Section 5.6. Such <br /> permits ar entit�ements issued �o wastewater system users shall <br /> not be transferable except between owners of the land for which <br /> they were issued; provided, however, that each Agency may require <br /> � that such permits or entitlernents and the capacity rights <br /> pertaining thereto shall expire for non-use within a specified <br /> term following the operative date of the Substaqe to which they <br /> pertain and that upon such expiration aIl treatment capacity <br /> rights thereunder revert to the issuing Agency. No treatment . <br /> capacity rights for any Substage af Stage � 2 af the Praject shalZ . <br /> revert, or be relinquished to, ar be� acquired by, the Authority; <br /> provided, hawaver, that inter--Agency transfers may be made <br /> subject to Cammission appraval as hereinabove and in Section 7.3 <br /> provided." <br /> " (c) Limitations Exceeded. If the Authority shall <br /> notify any Aqency in writing at any time that such Agency's use <br /> of the Joint Facilities has exceeded its maximum capacity rights, <br /> � such Agency shall imznediately take steps to reduce its use of the <br /> 5 <br />