My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, • _ - F""��:djc 8/15/85 <br /> Y n <br /> � � °. L.�S:djc 9/09/85R <br /> '' � � ' ' DES:djc 9/18/85R <br /> Subdivision (b) of Section 5.6. In the event any one, or mare <br /> � than one, of Substages 2-4 is or are not so constructed, all <br /> potential capacity righfs pertaining thereto shal]. terminate, and <br /> any payments therefor sha11 be disposed of in accordance with <br /> said Subdivision (b) of Section 5.6. � <br /> "Wastewater system cannection permits or other forms af <br /> entitlement to use treatment capacity within the limits of the <br /> maximum capacity rights allocated to each Agency shall confarm to <br /> �.he financing requirements for each 5ubstage df 5tage 2 of the <br /> Project as provided in Subdivision (b) of Section 5.6. Such <br /> permits ar entit�ements issued �o wastewater system users shall <br /> not be transferable except between owners of the land for which <br /> they were issued; provided, however, that each Agency may require <br /> � that such permits or entitlernents and the capacity rights <br /> pertaining thereto shall expire for non-use within a specified <br /> term following the operative date of the Substaqe to which they <br /> pertain and that upon such expiration aIl treatment capacity <br /> rights thereunder revert to the issuing Agency. No treatment . <br /> capacity rights for any Substage af Stage � 2 af the Praject shalZ . <br /> revert, or be relinquished to, ar be� acquired by, the Authority; <br /> provided, hawaver, that inter--Agency transfers may be made <br /> subject to Cammission appraval as hereinabove and in Section 7.3 <br /> provided." <br /> " (c) Limitations Exceeded. If the Authority shall <br /> notify any Aqency in writing at any time that such Agency's use <br /> of the Joint Facilities has exceeded its maximum capacity rights, <br /> � such Agency shall imznediately take steps to reduce its use of the <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.