My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Weather Weather Biochemical Suspended <br /> Flow Flow Oxygen Demand Solids <br /> Agency (in mgd) (in mgd) (Ibs. per day) (Ibs. per day) <br /> Belmont 1.06 0.44 1,193 1,193 <br /> Redwood City 6.44 2.685 7,27g 7,278 <br /> San Carlos 1.66 0.69 1,870 1,870 <br /> West Bay 2.84 1.185 3,212 3,212 <br /> Tota I 12.00 5.QO 13,553 13,553 <br /> (c) Total Allocated Maximum Capacitv Riqhts of the Proiect. The total <br /> respective maximum allocated capacity rights of the Agencies to the treatment <br /> capacity of the Project comprised of Stages 1 and 2 of are: <br /> Average <br /> Peak Wet Daily Dry <br /> Weather Weather Biochemical Suspended <br /> Flow Flow Oxygen Demand Solids <br /> Agency (in mgd) (in mgd) (Ibs. per day) (Ibs per day) <br /> Belmont 9.86 2.74 6,397 6,871 <br /> Redwood City 36.94* 14.085 46,005 43,788 <br /> San Carlos 15.96 4.39 8,852 11,824 <br /> West Bay 17.24 7.785 17.349 16.520 <br /> Total 80.00 29.00 78,603 79,Q03 <br /> *Peak Wet Weather Flow for Redwood City specified is for capacity rights in the treatment plant; <br /> Redwood City's Peak Wet Weather Flow capacity includes capacity in the subregional conveyance <br /> facilities of 25.9 mgd plus the additional flow of 4.6 mgd in the Redwood Shores force main. <br /> (d) Acauisition of Allocated Maximum Capacity Rights. <br /> (i) Sta�e 1.The Agencies acquired their respective capacity rights in and to <br /> Stage 1 of the Project upon completion of construction thereof. <br /> (ii) Staqe 2. The Agencies shall acquire and have acquired their respective <br /> capacity rights in Stage 2 of the Project as set forth in this Subdivision (d)(ii) of <br /> Section 7.2. With the prior written approval of the Commission, any Agency may <br /> relinquish to any other Agency any portion of its initial maximum potential capacity <br /> rights in Stage 2 of the Project as agreed upon by said two Agencies prior to <br /> commencement of construction of any increment of Stage 2. Thereupon the <br /> Agency so obtaining such relinquished rights shall be entitled to obtain maximum <br /> capacity rights equal to the sum of its initial rights plus its acquired rights. <br /> With respect to the first increment of Stage 2, the respective capacity rights <br /> of the Agencies accrued upon construction thereof; provided, however, that each <br /> SBSA JPASuppVl_052212 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.