My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency reimbursed the Authority according to its respective allocated share of the costs of <br /> construction thereof based upon its respective proportionate ownership of capacity rights <br /> pursuant to Subdivision (b) of Section 5.6 prior to acquiring any further capacity rights. With <br /> regard to subsequent increments, no such rights shall accrue until advance full payment <br /> therefor has been made, and the corresponding increment has been constructed pursuant <br /> to Subdivision (b) of Section 5.6. In the event any one, or more than one, increment is not <br /> so constructed, all potential capacity rights pertaining thereto shall terminate, and any <br /> payments therefor shall be disposed of in accordance with said Subdivision (b) of Section <br /> 5.6. <br /> Wastewater system connection permits or other forms of entitlement to use <br /> treatment capacity within the limits of the maximum capacity rights allocated to each <br /> Agency shall conform to the financing requirements for each increment of Stage 2 of the <br /> Project as provided in Subdivision (b) of Section 5.6. Such permits or entitlements issued <br /> to wastewater system users shall not be transferable except between owners of the land for <br /> which they were issued; provided, however, that each Agency may require that such <br /> permits or entitlements and the capacity rights pertaining thereto shall expire for non-use <br /> within a specified term following the operative date of the increment ta which they pertain <br /> and that upon such expiration all treatment capacity rights thereunder revert to the issuing <br /> agency. No treatment capacity rights for any Substage of Stage 2 of the Project shall revert, <br /> or be relinquished to, or be acquired by, the Authority; provided, however, that inter-Agency <br /> transfers may be made subject to Commission approval as hereinabove and in Section 7.3 <br /> provided. <br /> (e) Limitations Exceeded. If the Authority shall notify any Agency in writing at any <br /> time that such Agency's use of the Joint Facilities has exceeded its maximum capacity <br /> rights, such Agency shalt immediately take steps to reduce its use of the Joint Facilities so <br /> as to be within its maximum capacity rights. If any such Agency is unable to do so, it may, <br /> with written approval of the Authority (i) purchase or lease capacity from any other Agency <br /> which has surplus or unused capacity rights or (ii) at its own expense, provide for <br /> modifications to pumping, conveyance or treatment facilities so as to accommodate its <br /> excess use of the Jaint Facilities. If any Agency fails to comply with the provisions of this <br /> Subdivision, the Authority may take any necessary action under Section 7.4 or Section 7.6." <br /> S BSA_J PASuppVl_03122013r <br /> 12r <br />
The URL can be used to link to this page
Your browser does not support the video tag.