Laserfiche WebLink
<br /> ,,- JBB:ls 3/12/84 <br />. ' SOUTH BAYSIDE SYSTEM AUTHI Y <br /> EXHIBIT A <br />8 DISTRIBUTION OF CAPITAL COSTS FOR STAGE ONE OF THE PROJECT <br /> <br /> Capital Cost Distribution as a <br /> percentage of Final Total Costs <br /> Belmont San Carlos Redwood Menlo <br /> City <br />1. Menlo Park Pumping Plant & Force <br /> Main to Redwood City 0.0 0.0 0.0 100.0 <br />2. San Carlos Outfall from Existing <br /> Pumping plant to New Pumping Plant 0.0 100.0 0.0 0.0 <br />3. New F.M. Booster Station & San <br /> Carlos Pumping Plant 0.0 40.0 0.0 60.0 <br />4. Redwood City Meter & Pumpi ng <br /> Plant Modifications 0.0 0.0 lOO.O 0.0 <br />5. Harbor Industrial S.M.D <br /> Metering Facilities 0.0 lOO.O 0.0 0.0 <br />6. Belmont Standby Power, Pumping <br /> Plant Modifications & Force <br /> Main Connection 100.0 0.0 0.0 0.0 <br />8. Subregional Treatment Plant at <br /> Redwood Shores 8.8 l3.8 53.7 23.7 <br />Note: 1. Capital costs include readily identifiable costs of construction, <br /> including engineering design, construction supervision and change <br /> orders during construction. Costs of special services, including <br /> soils studies, surveys, rights-of-way, legal and administrative <br /> expepses and preliminary engineering (including reports), are not <br /> included. ' <br /> 2. - Co s t s of special services described in Note 1 above shalL be <br /> distributed in accordance with each Agency's percentage of the total <br /> costs of constructing all of Stage 1 of the Project. In equation <br /> form this would be as follows: <br /> Agency percentage of special services costs = <br /> Agency Capital Costs <br /> Total Costs of Stage 1 of Project <br /> 3. The percentages set forth above are based on actual costs, exclusive <br /> of any State and/or Federal grants received. Should any such grants <br /> be received prior to, during, or after the completion of <br /> construction, they shall be returned to each of the Agencies, in <br /> accordance with the rules and regulations which govern at the time <br />8 of receipt of such grants. <br /> 4. Capital costs are based on the assignment of 40% to Flow and 30% to <br /> BOD and 30% to Suspended Solids and the Maximum Capacity Rights <br /> (Section 7.2) . <br /> * 100'11. ~ecycled <br /> Paper <br />