My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt84 South Bayside System Aut
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1984
>
Agmt84 South Bayside System Aut
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:37:41 PM
Creation date
3/25/2004 12:12:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
suppl agmt III - joint exercise of powers
RMP File Number
304 bin 12
Date
4/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> , . p.~S: djg-c 2/21/84 <br />. , -.::S: djg-c 3/05/84R <br /> DES:djg-c 3/l2/84R <br />"'~" <br />. 2. Section 1.22 of the Agreement is hereby amended to read <br /> as follows: <br /> " Section 1.22. Joint Facilities. 'Joint Facilities' <br /> means the 1969 Facilities, all facilities conveyed to the <br /> Authority pursuant. to Section 5.8 hereof, Stage 1 of the Project <br /> and Stage 2 of the Project. II <br /> 3. Section 1.23 of the Agreement is hereby amended to read <br /> as follows: <br /> "Section 1.23. Joint Conveyance Faciliti~s. 'Joint <br /> Conveyance Facilities' means those facilities shown in Exhibit D <br /> attached hereto and hereby made a part of this Agreement and <br /> generally described as follows: <br /> "The new West Bay pumping plant and new force main to <br />. Redwood City; the existing Redwood City pumping plant and force <br /> main to San Carlos; the new San Carlos pumping plant; the existing <br /> Belmont pumping plant; the existing force main extending from the <br /> new San Carlos pumping plant to the deep water end of the bay <br /> outfall, including connections to the new treatment plant of the <br /> Authority to be constructed at Redwood Shores (Stage 1 of the <br /> Project); and the existing Belmont force main extending from the <br /> existing Belmont pumping plant to a new connection (to be <br /> constructed) with the existing force main to the deep water end of <br /> the bay outfall." <br /> 4. Section 1.25 of the Agreement is hereby amended to read <br /> as follows: <br />. "Section 1.25. Menlo. 'Menlo' means the formerly <br /> <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.