My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt84 South Bayside System Aut
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1984
>
Agmt84 South Bayside System Aut
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:37:41 PM
Creation date
3/25/2004 12:12:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
suppl agmt III - joint exercise of powers
RMP File Number
304 bin 12
Date
4/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~' D-~S:djg-c 2/21/84 <br />. , :S : d j g-c 3/05/B4R <br /> IJf:S:djg-c 3/l2/84R <br />-'-', <br />. named Menlo Park Sanitary District, which subsequent to entering <br /> into the Agreement changed its name to West Bay Sanitary District, <br /> a sanitary district duly organized and existing in the County <br /> under the Sanitary District Act of 1923 (Sections 6400 et seq. of <br /> the Health and Safety Code of the State), and the Constitution of <br /> the State (see also, definition of 'West Bay')II. <br /> 5. Section 1.29 of the Agreement is hereby amended to read <br /> as follows: <br /> IISection 1.29. Project. 'Project' means Stage 1 of <br /> the Project and Stage 2 of the Project. 'Stage 1 of the project' <br /> means Alternative SB-B as set forth and described in the Project <br /> Report. The elements of said Alternative SB-B are listed as items <br />. 1 to 7 inclusive, in Exhibit A hereto. <br /> II'Stage 2 of the Project' means the expansion of the <br /> Joint Facilities from a designed wastewater treatment capacity <br /> volume of 24 million gallons per day average daily dry weather <br /> flow to 30 million gallons per day. Stage 2 of the Project shall <br /> be acquired and constructed in four substages ('Substages 1-4') <br /> comprised of improvements or additions to Stage 1 of the Project <br /> increasing the aforesaid designed capacity in increments of 2, 1, <br /> 1, and 2 millions of gallons per day flow, respectively. The <br /> elements of Stage 2 of the Project and the substages thereof are <br /> described in Chapter 6 of that certain report dated August 1983 <br /> entitled 'Report on Capacity Study and Long Range Plan for <br /> Wastewater Treatment Plant Enlargements, South Bayside System <br />. Authority', prepared by Kennedy/Jenks Engineers, Consulting <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.