Laserfiche WebLink
EXHIBIT "D" <br /> HOURLY RATES <br /> PERSONNEL H�URLY RATES <br /> ENGINEERING <br /> Associate $178.0� <br /> Proj ect Manager $168.00-$174.00 <br /> Engineer IV $156.0� <br /> En�neer I,II,III $110.00-$126.00-$144.00 <br /> PLANNING <br /> Planner I,II,III $I 10.00-$126.0�-$144.00 <br /> S[IRV EYING <br /> Associate $178.00 <br /> Proj ect M anager $16 8.00-$174.0 0 <br /> Surveyor I, II,III, N $110.00-$126.00-$ 144.00-$156.00 <br /> Survey Party Chief $149.00 <br /> Suroey Chainman $92.00 <br /> Apprentice I, II,III,IV $58.�0-$80.00-$91.00-$102.00 <br /> Instrumentman $122.00 <br /> DESIGN AND DRAFTING <br /> Techniaan I,II,III $10 6.0�-$I 13.0 0-$124.0 0 <br /> Drafter I, II,III, N $82.00-$91.D0-$99.00-$1�9.0� <br /> Student FngineerlSurveyor $58.00 <br /> CONS TRUCTIQN ADMINISTRATIDN <br /> Senior ConstrucTxon Administrator $165.D0 <br /> Resident Engineer $121.00 <br /> Field En�neer I,II, III $110.00-$127.00-$144.00 <br /> SERVICES AND EXPENSES <br /> Proj ect Assistant $69.00 <br /> ClericalJAdministrative Assistant $58.D0 <br /> ATTY/AGR/2013.052/BKF-REDWOOD TOWERS PROJECT 25000 <br /> REV: 04-09-13 VR <br /> Page 14 of 14 <br />