Laserfiche WebLink
6.1. E. - Page 10 <br /> Optional Allowances: <br /> Task 8- Supplemental Nlaterial Testing $18,700 <br /> Task 9 - Additional Services <br /> $24,960 <br /> Total Without Allowances $99,840 <br /> Total With Allowances $143,500 <br /> SCHEDULE <br /> Work shall be completed per the following schedule: <br /> Hydrographic Survey 3 weeks from NTP <br /> Preliminary Design Memorandum 6 weeks from NTP <br /> Material Testing Results (if needed by agency) 8 weeks from NTP <br /> 75°� complete drawings and specifications 10 weeks from NTP <br /> 100% complete drawings specifications 2 weeks from comments on 75% <br /> Nofinrithstanding the maximum amounts set forth in the fee estimate above for Tasks <br /> one through seven, Direct Costs and Optional Allowances eight and nine, the City may, <br /> in its sole and absolute discretion, approve in writing transfers of funds among the ten <br /> categories from time to time in order to provide for revised maximum amounts in any or <br /> all of the categories, as long as the total amount for funding of the ten categories does <br /> not at any time exceed the maximum contract amount set forth in the fee estimate. <br /> RATE SCHEDULE <br /> All fees shall be charged on a time and materials basis, commensurate with work <br /> completed, and in accordance with the hourly rate schedule below except that <br /> Subcontractor or Outside Services shall be charged at cost plus 10% (rather than the <br /> cost plus 15% reflected below). <br /> Page 7 of 9 <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 4 MOFFATT AND NICHOL <br /> REV: 07-09-13 VR <br />