My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-07-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 5:12:30 PM
Creation date
7/19/2013 3:15:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. E. - Page 10 <br /> Optional Allowances: <br /> Task 8- Supplemental Nlaterial Testing $18,700 <br /> Task 9 - Additional Services <br /> $24,960 <br /> Total Without Allowances $99,840 <br /> Total With Allowances $143,500 <br /> SCHEDULE <br /> Work shall be completed per the following schedule: <br /> Hydrographic Survey 3 weeks from NTP <br /> Preliminary Design Memorandum 6 weeks from NTP <br /> Material Testing Results (if needed by agency) 8 weeks from NTP <br /> 75°� complete drawings and specifications 10 weeks from NTP <br /> 100% complete drawings specifications 2 weeks from comments on 75% <br /> Nofinrithstanding the maximum amounts set forth in the fee estimate above for Tasks <br /> one through seven, Direct Costs and Optional Allowances eight and nine, the City may, <br /> in its sole and absolute discretion, approve in writing transfers of funds among the ten <br /> categories from time to time in order to provide for revised maximum amounts in any or <br /> all of the categories, as long as the total amount for funding of the ten categories does <br /> not at any time exceed the maximum contract amount set forth in the fee estimate. <br /> RATE SCHEDULE <br /> All fees shall be charged on a time and materials basis, commensurate with work <br /> completed, and in accordance with the hourly rate schedule below except that <br /> Subcontractor or Outside Services shall be charged at cost plus 10% (rather than the <br /> cost plus 15% reflected below). <br /> Page 7 of 9 <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 4 MOFFATT AND NICHOL <br /> REV: 07-09-13 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.