My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-07-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 5:12:30 PM
Creation date
7/19/2013 3:15:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 227 <br /> • Wastewater Capacity <br /> • Water Meter Installation <br /> • Water System Capital Facilities <br /> • Water Tap <br /> • Site Plan and Architectural plan review as per the State Building and Fire Code for High- <br /> Rise structures. This also includes the necessary smoke evacuation or control systems <br /> design criteria. <br /> • Fire sprinkler, fire pump, back-up water supply, standpipes, and fire alarm plan review. <br /> • Fire Department site inspections for the fire sprinkler system, standpipes, fire pump, <br /> water supply, fire alarm, and smoke evacuation or control systems. <br /> • Final inspection for exiting evacuation plans, and radio testing. <br /> • Building plan check <br /> • Building permit, including any specific system permits, such as plumbing, mechanical, <br /> electrical. <br /> D. Public Improvements <br /> As part of the development of the Project, the Developer shall be responsible for <br /> constructing the following public improvements for all frontage abutting or adj oining the Site: <br /> • New sidewalk, curb, gutter <br /> • Catch basins and drainage inlets due to reconfigured roadway, sidewalk/curb/gutter work <br /> • Landscaping street trees <br /> • Street lights <br /> • Pedestrian lights <br /> • Water service (domestic, irrigation, fire, & recycled water) <br /> • Sewer service <br /> • Traffic signal improvements necessitated by the project (if and as required as part of a <br /> Proj ect Approval) <br /> Developer may, at its option and subject to the requirements of the Parking Covenant, <br /> provide for valet parking as part of the operation of the parking garage for the Proj ect. <br /> E. Parkin� Obli at� ions <br /> The parking obligations to be maintained on the Site are set forth in the Parking Covenant <br /> and Agreement, attached to the DDA as Attachment I. <br /> F. Developer Public Benefit Contribution for Depot Circle Improvements <br /> A portion of the Site lies adj acent to the Caltrain Station and property owned by <br /> the City. The City is in the process of planning for the development of its property, which is <br /> proposed to be a significant unifying urban landmark that will transform the area into a focal <br /> point and create a grand and welcoming entrance to the City for train passengers. Developer shall <br /> contribute $1,000,000 for development and installation of an iconic structure, public plaza or <br /> 82483.00009\7571312.11 -2- <br /> Exhibit H <br /> Scope of Development <br /> ATTY/AGR/2013.118/BLOCK 2 HUNTER STORM <br /> REV: 07-19-13 PT <br />
The URL can be used to link to this page
Your browser does not support the video tag.