Laserfiche WebLink
_ . �� .� ��. �:�:� __ <br /> 12. Subsurface utilities when marked in advance with marking paint and identified. <br /> 13. Geologic features such as rock outcroppings large boulders or exposed bedrock. <br /> 14. Incorporate applicable record drawings from the City. <br /> 15.All other features such as fencing, gates, planters, benches, bike racks, tables, play <br /> equipment. <br /> 16. Redwood City Datum shall be used in preparing the topographic survey. The City <br /> will provide the location of the nearest benchmark if required. <br /> DELIVERABLES: <br /> 1. AutoCad electronic files <br /> 2. PDF Files <br /> PROJECT SCHDULE: <br /> Project Schedule shall be based on calendar days considering day number one as the Notice to <br /> Proceed and will require completion 15 days upon receipt of Notice to Proceed. <br /> ATTY/AGR/2013.125/McLeod($3,920.00) <br /> REV:07-26-13 VR <br /> Page 5 of 6 <br />