The widening of Woodside Raad, inclusive of this intersect�on, is included in the <br /> City's Traffic Ir�pact F'ee Program (TIF) project list. However, there is no current <br /> design option that is aco�ptable to both Caltrans and the City af Redwood City; <br /> therefore, this improvement may be infeasible. <br /> Finding: If a design for widening Waodside Road can be developed which is acceptable to <br /> both Caltrans and the City of Redwood City, payment of the T�affic Impact �ee <br /> by the applicant would mi#igate the propased project's contribution to the <br /> significant cumulative impact to a less-than-signi�cant level. If it is determined <br /> that the Woodside Road impra�ements remain infeasible f�eca�se the <br /> impro�ements are not cansistent with the New Redwaod City General Plan <br /> andlor Caltrans policy, the cumulative impact wauld remain signifrcant and <br /> unavo�dable, as would the praposed project's contribution to that cumulative <br /> impact. <br /> Facts fn 5upport af Finding: implementation of Mitigation 7-1�4 would reduce the project's <br /> contribution to the cumuEati�e traffic impact at the Woodside RoadlMiddlefield <br /> Road intersection to a iess-than-significant levef through the project's payment of <br /> its City 7raffic Impact Fee to add a southbound (Woodside Road} through lane, <br /> as well as possible crosswalks and pedestrian signals per the City's General <br /> Plan, and other multimodal improvem�nts per Caltrans dfrectives. Hawever, the <br /> City and Caltrans have nof agreed on a design option for widening Woodside <br /> Road, so the impact is currently considered significant and una�oidable. These <br /> facts are described in Draft EIR chapter 7 (Transportativn, Circuiation, and <br /> Parking) on pages 7-1 through 7-70, Draft EfR appendix 24.3 (5upplemental <br /> Transpo�tation Informatior�), and Final EER appendix A (Supplemental Traffic <br /> Information), which are hereby incorporated by reference. <br /> Impact: Impact 7-16: Cumulative With Project Impact on Douglas A�enuelBay Road <br /> Intersection. Under Cumulati�e With Projec� conditians during the PM peak <br /> �our, the intersection wauld degrade from L�S C to LOS F, and the proposed <br /> project could contribute up to 78.2 secands of critical delay to the intersection. <br /> Mitigatian: Mitigation 7-15. To mitigate the significant cumulative impact at the intersection <br /> of Douglas A�enue and Bay Road, the intersectian would need to be signalized <br /> with pratected phasing on the eastbound and westbound approaches on Bay <br /> Road. !n addi#ian to signalization, both the eastbound and westbound <br /> approaches would need to be restriped to include a total of one left-turn lane and <br /> one shared throughlright-turn lan� an both the eastbound and westbound <br /> approaches. With #hese impravemerits, the le�el of service {LOS} at this <br /> intersection would improve to accep#able LOS C during the PM peak hour. <br /> ATfY/RE50.2898/PC RE50 RECOMMENDfNG STANFQRD EIR CERTIFICATION <br /> REV:OS-15-13 VR <br /> Page 3$of Sfi <br />