Laserfiche WebLink
size to accommodate t�� long-term r�eeds of academic an� academic support users for whom <br /> an appropriate Iocation on the main Stanford campus is not available, feasible, ar essentEal. <br /> Plan the camp�s with sufficient ffezibility to aElow office, <br /> researchlde�elopment, and medical clinic uses by Stanford at�dlor othe�users. <br /> Redevelop the pro�ect development s�e to conserve nat�ral <br /> resources through sustainable land use components and building features, including those <br /> affecting transportation, energy, water, and air qualify. <br /> Redevelop the site so that it enhances the qua�ity and value of the <br /> adjacent residential neighbarhood. <br /> Redevelop the site in a manner which promates and enhances a <br /> healthy and diverse ecanorr�y in Redwood City. <br /> Transform the �roject site's existing campus design ta allow <br /> development inter�sity in a manner which implements the City's New General Plan vision for <br /> land use, urban form and density, economic devefopment, and circulaf+on. <br /> Create a paftern of smaller City blocks integrated into the <br /> neighbarhood-scale street grid. <br /> Provide a high-quality campus wi#h substantial usable open <br /> space. <br /> �nsure that the forgoing objectives are achieved through <br /> preparation and approval of a comprehensive �and use plat� addressing such issues as <br /> development standards, design guidelines, and capital improvement plans and policies. <br /> Discussion and Findings Re�ating to the Alternati�es Evaluated in the Draft EIR <br /> Under CEQA, a "No-Project Alternati�e" compares the impacts of prooeeding with a <br /> proposed project with the impacts of not praceeding with the proposed project. A No-Project <br /> Alternative describes the environmental conditions in existence at the time the Notice of <br /> Preparation was published, along with a discussion of what would be reasonably expected to <br /> occur at the site in the foreseeable future, based on current plans and consistent with a�ailable <br /> infrastructu�e and cammunity services. <br /> Here, t#�e EIR considers in detail two No-Praject Alternatives, one of which assumes only <br /> that existing buildings on the Project site would be fully occupied and the other af which <br /> assumes that the Praject site wouid be built out to its currently permitted 0.7 FAR. The EkR also <br /> considered in detail three Action Alternati�es, and explained why an alternate project Iocation <br /> was not considered in detail. <br /> No Project—Full Occupancy of Existing Buildings Alternative (Alternati�e 18.1j <br /> ("Existing BuiEdings Aiternati�e"y. <br /> Under the Existing Suildings Alternative, existing buildings on tfie development site <br /> would be fully occupied with offioe and R�D uses. None of the adverse ar beneficial <br /> enviranmental �mpacts of the Project would occur. <br /> ATTYIRE50.2898/PC RE50 RECOMMENDING STANFORp EIR CERTlFICATION <br /> REV:08-15-23 VR <br /> Page 47 of 56 <br />