My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-16 2898 PC Reso Recommending Stanford EIR Certification
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-16 2898 PC Reso Recommending Stanford EIR Certification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2013 9:39:20 AM
Creation date
8/22/2013 9:34:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
8/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the Project would be reduced to a fess than significant level by the R8�D,Hotel, and Restaurant <br /> Aiternative. <br /> The R&D, Hotel, and Resta�rant Alternati�e would reduce climate change impacts <br /> compared to the Project because its COz-equivalent emissions would be 3.6 metric tons per <br /> capita, comparsd to the Project's 4.9 metric tons; neither the R&D, Notel, and Restaurant <br /> Alternati�e nor the Project waufd cause a significant clima#e change impact. <br /> Due to its increased R&D square footage and its restaurant uses, the R&D, Hotel, and <br /> Restaurant Alternati�e would cause fncreased water and wastewater impacts compared to the <br /> Project that cauld be sigr�ifican# and unavaidable. <br /> The R&D, Hotel, and Restaurant Alterna#i�e wauld not ad�ance the fallowing project <br /> objecti�es: {i) rede�e�opment of the de�elopment site for a Stanford University satellite location <br /> af sufficient size to accommadate the iang-term needs of academic suppar� users; and <br /> (ii) planning of the campus with sufficient flexibility to allow office, R&D, and medical clinic uses. <br /> If any project proponent were to implement this alternati�e, it could partially achieve the <br /> project objective of redeveloping the si#e ta canserve natural resources througl� sustainable land <br /> use companents and building features, although there would be no guarantee that this <br /> alternative would include the robust sustainability features, including a the state-af-the-art TDM <br /> program, that have been proposed by 5tanford. If a project propflnent were to imp�ement this <br /> alternative, i# could meet ar partially meet the project objecti�es of redeveloping the site to <br /> enhance the quality and value of the adjacent residentiaf neighborhood, promote and enhance a <br /> healthy and diverse economy in the Ciiy, and transfarming the de�elopment site's existing <br /> design to implement the New General Plan vision. <br /> If a project proponent were to implement this alternative, it could implement the project <br /> objecti�es af creating a pattern of smaljer City blocks integrated into the neighborhood-scale <br /> street grid, providing a high-quality campus with substantial usable open space, and ensuring <br /> that some project objectives are achie�ed thro�agh a comprehensi�e land use plan. Hawever, it <br /> is uncertain whether any project proponent would be willing to implement this alternati�e. For <br /> that reason, this alternative would not satisfy these abJect9ves as fully as the Project. <br /> On balance, the en�ironmental benefits that might be achieved with this alternati�e are <br /> autweighed by its environmental impacts compared to the Project, its reduced en�ironmental <br /> benefits compared to t�e Project, its failure to achie�e two basic praject abjectives, and its <br /> impairment of the ability to fully satisfy many of the other project objectives. The City Co�nciE <br /> rejects this alternative. <br /> With Housing Alternati�e {1.0 FAR� (Alternative 98.5). <br /> This alternative would consist of office, medical clinic, and R&D uses, as we�l as <br /> approximately 228 residential units, within a 1.0 FAR. <br /> Significant adverse environmental impacts of tf�e Project that would be reduced by the <br /> �th Housing Altemative are c�rtain traffic and air quality impacts, as described in the �IR. <br /> Some intersection le�el of service impacts tha# could be significant and una�oidable under the <br /> Project (�f other ager�cies with jurisdiction do not approve mitigation) mfght be less than <br /> significant und�r the With Housing Alternative. The Project's significant u navaidable operational <br /> ATTYIRE50.2898IpC RE50 RECOMM�NDING STANFORD EIR CERTIFICATION <br /> REV;Q8-15-�3 VR <br /> Page 51 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.