Laserfiche WebLink
6.1.G. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> August 26, 2013 <br /> SUBJECT <br /> Award of Contract — 2012-2013 Sanitary Sewer Replacement Project <br /> RECOMMENDATION <br /> By motion, approve the contract documents and award the standard form contract <br /> 00520 for the 2012-2013 Sanitary Sewer Replacement Project to Con-Quest <br /> Contractors Inc. of San Francisco, California for their responsive and responsible low <br /> bid of $1,999,581.50 and authorize the City Manager to increase the contract amount, if <br /> necessary, up to 10% of the amount awarded, not to exceed $2,199,539.65. <br /> BACKGROUND <br /> The City systematically replaces sections of aging sewer infrastructure to ensure the <br /> continued reliability of the system. Each year, staff identifies pipelines that require <br /> excessive maintenance or experience repeated service disruptions and target those <br /> pipelines for improvement. <br /> Closed Circuit Television (CCTV) inspection review of Sanitary Sewer Basin Nos. 3 and <br /> C04 was completed in 2012. Staff's review of the inspection videos revealed numerous <br /> defects in these sewer basins. A number of construction options for repair/replacement, <br /> including traditional open trench and trenchless pipe-bursting techniques, were <br /> evaluated by the staff to determine the most cost-effective method of mitigation. This <br /> project combines both traditional and trenchless construction techniques in order to <br /> minimize disruption to the residents and deliver a cost-effective project. <br /> The proposed sanitary sewer replacement project will improve the condition of, and <br /> minimize infiltration and inflow into, the sewer collection system. This project will <br /> replace approximately 9,591 lineal feet of 6-inch, 8-inch, 12-inch and 15-inch vitrified <br /> clay pipe (VCP) sewer main with new 6-inch, 8-inch, 12-inch and 18-inch polyvinyl <br /> chloride pipe (PVC) and high density polyethylene (HDPE) pipe and replace 46 sanitary <br /> sewer manholes and 221 sanitary sewer laterals. <br /> ANALYSIS <br /> The six (6) bids received for the 2012-2013 Sanitary Sewer Replacement Project at the <br /> bid opening on July 3, 2013 are summarized below. <br />