My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant will draft a distribution list of appropriate public and quasi-public agencies to receive the <br /> NOP, including state agencies via the State Clearinghouse. Consultant will prepare and appropriately <br /> transmit the NOP to all required and selected public agencies and the County Clerk. City will publish and <br /> circulate the NOP to all other non-agency interested parties and organizations. Consultant will attend a <br /> Public Scoping Meeting to be facilitated by the City. Consultant will support staff to prepare meeting <br /> materials as necessary and directed by City. City will arrange for the Scoping Meeting to be digitally <br /> recorded (audio or transcription), from which consultant will prepare a written summary of all scoping <br /> comments,which will subsequently be included in an appendix to the Draft EIR with references to where <br /> in the Draft EIR each scoping comment is addressed. <br /> Task 4: Prepare Administrative EIR Settings. Consultant will prepare Administrative EIR Settings in <br /> advance of the Administrative Draft EIR (Task 5). For each environmental topic in the EIR, the Setting <br /> will address physical and regulatory conditions, consistency with applicable approved City plans and <br /> policies,and applicable CEQA significance criteria and thresholds. <br /> Fehr & Peers will describe and provide an analysis of the existing conditions for the study intersections <br /> and freeway segments and ramps (listed below in Task 5.14 in Section II.B of this scope of work). <br /> Existing traffic operations at intersections will be analyzed using the procedures outlined in the Highway <br /> Capacity Manual (HC1Vn for freeway on- and off-ramps, and study intersections. Fehr & Peers will <br /> qualitatively analyze the existing conditions of transit,bicycle and pedestrian locations and facilities,with <br /> a focus on connections to the study area. Gaps in traffic, transit, bicycle and pedestrian systems will be <br /> noted. <br /> Task 5: Prepare Draft EIR. Overview: Consultant will prepare the Draft EIR pursuant to the requirements <br /> of the CEQA, California Public Resources Code Sections 21000 et sequitur, and CEQA Guidelines, Title <br /> 14, California Code of Regulations 15000 et seq. The Draft EIR analyses will also be prepared in <br /> accordance with current professional standards and practices and consistent with significance criteria <br /> approved by the City.The Draft EIR will present the necessary substantial evidence to support that adoption <br /> of, and development or other changes that could occur under the Specific Plan, either would or would not <br /> result in a significant effect(as defined by CEQA)on each of the environtnental topics potentially affected. <br /> The analysis of the Specific Plan will be conducted at a program level, which will apply program-level <br /> significance criteria and thresholds and as necessary identify programmatic mitigation measures. Consistent <br /> with the City's goal for the Specific Plan to be"self mitigating,"policies identified in the Specific Plan will <br /> be considered part of the Plan,and their implementation and compliance will be assumed. <br /> The Draft EIR will be organized in a clear and familiar format with data and discussions that are <br /> understandable to the lay reader. The Draft EIR will include an Introduction; EIR Summary; Project <br /> Description (see Task 2); and sections for Environmental Setting, Impacts, and Mitigation Measures <br /> (detailed below); Alternatives (detailed below); Cumulative and Growth-Inducing Analysis and other <br /> Required Statutory Sections; EIR Preparers List; as well as Appendices and References and a list of <br /> Acronyms and Abbreviations used in the docuxnent. <br /> REV:09-27-13 VR <br /> Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.