My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� � <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> Task A: Modified IHSP Maximum Theoretical Buildout <br /> Additional work is required to update transportation work to reflect modi�cations to the IHSP <br /> Maximum Theoretical Buildout(MTB) scenario, the CEQA Proposed Project to be analyzed in <br /> the EIR. Sub consultant Fehr & Peers Transportation would primarily conduet the additionai <br /> work. <br /> a) Update the travel demand forecasts for the Proposed Project (Maximum Buildout <br /> scenario)to reflect the revised project. <br /> b) Prepare new trip generation, distribution, and assignment forecasts using the same <br /> methods presented in in the lnner Harbor Specific Plan: Draft EIR Travel Demand <br /> Forecasts (9125/2014). <br /> c) Update the traffic operations analysis for Existing Plus Project Conditions and <br /> Cumulative No Project Conditions incorporating the revised vehicle trip assignment. <br /> The revised traffic operations analysis will include AM and PM peak hour levels of <br /> service for the study intersections (Synchro and SimTraffic models) and freeway <br /> segments consistent with the IHSP ADEIR submitted in January 2015. <br /> d) Prepare the Screencheck DEIR transportation section wifh the results of the revised <br /> project description including the travel demand forecasts and revised impact analyses. <br /> The 5creencheck DEIR transportation section will also incorporate revisions based on <br /> comments received from ESA and Redwood City staff on the January 2015 ADEIR <br /> draft section, as described in the original scope of work. <br /> Additional limited effort is attributable to ESA's work with the City to develop the modified MTB <br /> and coordinate those revisions and implications with Fehr& Peers. <br /> Cost Summary Task A <br /> The total cost of the additional services described for "Modified IHSP MTB" is $8,590, as <br /> summarized below. <br /> MODIFIED IHSP MTB <br /> Actual/Estimated Labor Hours Total Cost <br /> ESA (Task 2) 6 $1,290 <br /> Fehr&Peers $7,300 <br /> Total a8,S90 <br /> REV:06-15-15 VR <br /> Page 3 of 18 <br /> ATTY/AGR.Amend No. 2/ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.