My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task B: Expanded Utilities Tasks <br /> Additional work is required to conduct expanded work r.elated to the utilities analysis for the <br /> IHSP EIR. The additional work would be conducted by Fuscoe Engineering, subconsultant to <br /> ESA. <br /> a) Determine existing/proposed utility demands for utility models (by West Yost and Wood <br /> Rogers). Utility demands will be determined through research and assumptians <br /> coordinated with City of Redwood City staff, their representatives, and as outlined in <br /> the Specific Plan Maximum Theoretical Build-out. These values and assumptions will <br /> be produced for Potable Water, Recycled Water, Sanitary Sewer, Fire, and <br /> Impervious/Pervious Areas (Storm Runoff). Assumptions, backup calculations and <br /> Summary Tables will be provided to the consultants preparing these models and will <br /> be included as an appendix in the Model Results/Reports. <br /> b) Provide the following information in order to support the initiation of a Water Supply <br /> Assessment (WSA) as required by the California Legislature in Senate Bill 610. This <br /> information will be limited to: <br /> (1) Tabulations of estimated pre- and post-development water usage, both potable <br /> and recycled using the data compiled from work item 1.a., above. <br /> (2) Inner Harbor project description and verbiage outlining assumed uses for each <br /> parcel within the Inner Harbor. <br /> (3) Site Map. <br /> (4) Language comparing/contrasting the values/assumptions in item (1) for the <br /> overall Inner Harbor Development to those found in the 2010 General Plan. <br /> Note: 2010 valueslassumptions shall be provided by the City of Redwood City. <br /> Cost Summarv Task B <br /> The total cost of the additional services described for "Expanded Utilities Tasks" is $8,000, as <br /> summarized below. Note that Fuscoe's existing unused EIR budget is reduced. <br /> EXPANDED UTILITIES <br /> TASKS <br /> (Subconsultant Task) <br /> Estimated <br /> Total <br /> Additional Fuscoe Services $11,000 <br /> Modified (Reduced)Original Budget $8,500 <br /> $19,500 <br /> Total Original Budget $11,500 <br /> Total Requested �8,000 <br /> (Shortfall) <br /> REV:06-15-15 VR <br /> Page 4 of 18 <br /> ATTY/AGR.Amend No.2/ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.