Laserfiche WebLink
Task B: Expanded Utilities Tasks <br /> Additional work is required to conduct expanded work r.elated to the utilities analysis for the <br /> IHSP EIR. The additional work would be conducted by Fuscoe Engineering, subconsultant to <br /> ESA. <br /> a) Determine existing/proposed utility demands for utility models (by West Yost and Wood <br /> Rogers). Utility demands will be determined through research and assumptians <br /> coordinated with City of Redwood City staff, their representatives, and as outlined in <br /> the Specific Plan Maximum Theoretical Build-out. These values and assumptions will <br /> be produced for Potable Water, Recycled Water, Sanitary Sewer, Fire, and <br /> Impervious/Pervious Areas (Storm Runoff). Assumptions, backup calculations and <br /> Summary Tables will be provided to the consultants preparing these models and will <br /> be included as an appendix in the Model Results/Reports. <br /> b) Provide the following information in order to support the initiation of a Water Supply <br /> Assessment (WSA) as required by the California Legislature in Senate Bill 610. This <br /> information will be limited to: <br /> (1) Tabulations of estimated pre- and post-development water usage, both potable <br /> and recycled using the data compiled from work item 1.a., above. <br /> (2) Inner Harbor project description and verbiage outlining assumed uses for each <br /> parcel within the Inner Harbor. <br /> (3) Site Map. <br /> (4) Language comparing/contrasting the values/assumptions in item (1) for the <br /> overall Inner Harbor Development to those found in the 2010 General Plan. <br /> Note: 2010 valueslassumptions shall be provided by the City of Redwood City. <br /> Cost Summarv Task B <br /> The total cost of the additional services described for "Expanded Utilities Tasks" is $8,000, as <br /> summarized below. Note that Fuscoe's existing unused EIR budget is reduced. <br /> EXPANDED UTILITIES <br /> TASKS <br /> (Subconsultant Task) <br /> Estimated <br /> Total <br /> Additional Fuscoe Services $11,000 <br /> Modified (Reduced)Original Budget $8,500 <br /> $19,500 <br /> Total Original Budget $11,500 <br /> Total Requested �8,000 <br /> (Shortfall) <br /> REV:06-15-15 VR <br /> Page 4 of 18 <br /> ATTY/AGR.Amend No.2/ESA Inner Harbor EIR Amendment No.2 <br />