My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
be commingled with comments pertaining to the IHSP analysis. This scope assumes a <br /> reasonable level of effort to prepare responses to comments unique to the Harbor View <br /> Place project. ESA also assumes some discrete additional effort to address an MMRP for <br /> the project, assuming any mitigation measures are identified. <br /> 2. Technical Tasks and Assumptions <br /> Table E-1 below describes the project-level technical analysis to be conducted for each <br /> environmental topic in the EIR. <br /> Table E-1 -Project-level Technical Tasks <br /> � _ _ _ <br /> ��'�-� �� � � <br /> - � T rE _ ���«������ �. _ <br /> 5.1 Ae�thetics� �� � � � <br /> Context: To assess whether the Project would have project-level ;Assumptions: <br /> The Project would alter the visual ` �mpacts or contribute to any cumulative impact,ESA will: <br /> character the IH-2 area of the Specific � � • No additional scenic view <br /> Plan Area(plan area).It would also ' • Assess the Project compared to IHSP policies regarding �R�dors or other visual <br /> potentially alter views of and through height,bulk,and visual qualiiy,as well as design guidelines resources will be considered <br /> portions of the plan area and change and parameters for future development,that are intended to ; �an those confirmed by the <br /> nighttime lighting and glare conditions, ; address aesthetic characteristics of the IHSP area. � City for the IHSP EIR <br /> as would have been evaluated at a assessment. <br /> program level in the IHSP EIR. • Review detailed information,illustrations and plans of the { , No project-level <br /> Project and,using objective descriptive categories,discuss <br /> The IHSP EIR would have identified whether the Project would substantially degrade or obstruct photographic visual <br /> scenic view comdors and resources publicly-accessible scenic views or substantially degrade simulations will be prepared <br /> and assessed program-level effects the existing visual character or quality of the area. ; by ESA or MIG. <br /> from up to five(5)public v�wpoints of � � q�ess potential change in nighttime lighting and glare <br /> bulk visual simulations of the IHSP effects. <br /> preferred scenario(prepared by MIG). <br /> Program level effects and mitigation <br /> measures would have been identified. ' <br /> REV:06-15-15 VR <br /> Page 9 of 18 <br /> ATTY/AGR.Amend No. 2lESA Inner Harbor EIR Amendment No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.