My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� a� _ t ��� s� �' ��'� '� � '�"".�3°�iju h ��r�r . <br /> : � '. ... y s 'F �' r� �[ ��. H a"`�����_ <br /> v fi a ...'��� ' <br /> � p,{.. , ` �— �� � ���,, '!.�_ t r� � � a€g �- . <br /> d � E <br /> .�t� �t[ r�— �",. ��. , j3tz'�.3�'�«�_ * , a...s '�E u...... „}�a�v�ett.. .^. � ..� ^ ra:r: �,. , �� <br /> Act among others).It will also have � Project site through this task. R� ; for this project analysi's.�' <br /> identified potential program level , . Specify federal,state,and local poliaes and regulations that � <br /> effects and mitigation measures. would apply to the Project,given any habitat onsite no � <br /> Development of the Project is not previously identified. <br /> expected to involve direct impacts to Describe onsite non-native species onsite that may be <br /> wetlands,waters,special aquatic sites, ` + �masive or considered a threat to s ecial status <br /> as none exist on or adjacent to the s ecies.Also describe as ects of the Pro ect that may <br /> project site.It may,however,effect p P ! <br /> trees or other avian use areas improve habitat conditions or create additional speaal <br /> status speaes habitat. <br /> • Discuss the Project relative to biological resources goals <br /> F and policies identified in the IHSP. <br /> : � Identify the potential pro�ect-level effects of the on special- <br /> status plants, commumties,or wildlife or wildlife migratory ," <br /> use areas. <br /> _ , - - -_ __ _�_______ <br /> 5.4 Cultural Resources � <br /> Context: i To assess whether the Project would have project-level <br /> The IHSP EIR would have described ! �mpacts or contribute to any cumulative impact,ESA will: �qssumptions: <br /> the IHSP cultural resources setting ; * Input and lists from the <br /> that would also apply to the Project, • Identify potential impacts to cultural resources from NAHC provided for the IHSP <br /> specifically information regarding any ; development of the Project. will also apply to this project- <br /> known sacred sites(from input by the ' „ Discuss the Pro ect relative to cultural resources oals and level analysis;no new <br /> Native American Heritage Commission � � 9 consultation would be <br /> for the IHSP EIR or other resources policies identified in the IHSP. <br /> � � initiated. <br /> that may be an important to the history , qs appropriate,identify project-level mitigation measures to ; <br /> of the area. address accidental discovery of cultural resources during � * Due to the developed and <br /> ground-disturbing construction efforts,based on the ; paved nature of the site,no <br /> program-level mitigation measures identified in the IHSP i field surveys of the site are <br /> EIR. proposed. <br /> � = No historic architectural <br /> � resources are assumed <br /> onsite. <br /> ' • No fiederal Section 106(i.e., <br /> � consultation with SHPO)is <br /> � required. <br /> _._. . _ _ _� �.n. <br /> 5.5 Geology,Soils,and Seismicity ° <br /> Context: To assess whether the Project would have project-level <br /> The IHSP EIR would have desaibed impacts or contribute to any cumulative impact,ESA wilL• �pssumption: <br /> the IHSP geology,soils,and seismic � ` . No soils testing is included <br /> setting that would also apply to the • Evaluate geological and seismic safety effects related to � in this scope of work. <br /> Project,specifically information construction and operation of the Project � <br /> regarding types and depths of materials i „ Discuss the Pro ect relative to eob ical or seismic o j <br /> ihat underlie the site;all site soils, J 9 9 g als <br /> geologic conditions and materials; ; and policies identified in the IHSP ! <br /> major earthquake fault systems in the E . qs appropnate,identify project-level mitigation measures to � <br /> region and relative to the plan area;and � address geological and seismic conditions,specifically from <br /> other potential hazards such as project and site-specific requirements or recommendations � <br /> liquefaction, F for geotechnical preparations and foundation systems <br /> iden6fied in the Project-specific geotechnical/soils report ` <br /> prepared by a qualrfied consultant of the project sponsor. <br /> REV:06-15-15 VR <br /> Page il of 18 <br /> ATTY/AGR.Amend No. 2/ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.