My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> , � a x� � � � �� � ��,.� <br /> ��� a `- ��.�-� _ t, � : �"�'" , r� t� t� �E �� <br /> ��, <br /> = . x . .. ��?�� . �� . . __ . ._ - rS,�. �� .��,... . . <br /> ,; ;, -: � .. . � ..,. <br /> 5.6 Greenhouse Gas�Emissions � �� <br /> Context: To assess whether the Project would contribute to a <br /> The IHSP EIR would have described ! cumulative impact,ESA wilL• � <br /> GHG emissions levels from '' j Assumptions: <br /> construction and development under '! + Use EMFAC2011 emission factors,the latest version of the � . The analysis will be <br /> the IHSP,including offsets from CaIEEMod air quality model to develop an emissions � conducted pursuant to <br /> removal of the existing uses that were ; inventory of the ProjecYs net contribution to GHG emissions i gqqQMD 2010/2011 <br /> developed in an era when building resulting from the ProjecYs increases in mobile source thresholds and CEQA <br /> codes and practices were less energy = emissions(i.e.,motor vehide traffic and VMT�and � Guidelines. <br /> efficient. stationary area source emissions(i.e.,natura gas � <br /> The IHSP EIR would have also �mbustion,electricity demand,water and wastewater <br /> described current extent of le islation treatment and conveyance and solid waste generation)and <br /> 9 ' of cafion dioxide equivalents(CO2e)under the proposed <br /> and regulations at state and local levels '' Pro'ect. <br /> regarding climate change and GHG ! � <br /> emissions � • Estimate the offset GHG emissions from existing uses that � <br /> { may be removed with implementation of the Project. <br /> • As feasible,post-processing adjustments will be made to <br /> the inventory to reflect PG&E-specific electrical emission <br /> factors for the relevant future year and to account for any <br /> identified sustainable building recommendations under the <br /> existing Green Building Ordinance.Factor quantifiable � <br /> Project-specific sustainability features into the Project � <br /> characteristic. <br /> ` * Assess the quantified GHG emissions that would result from � <br /> the Project.This determination will be made relative to ; <br /> BAAQMD's project-level threshold,4.6 metric tons of CO2e ; <br /> ' per service population to determine if GHG emissions are � <br /> cumulatively considerable.. � <br /> ' • Discuss the Project's sustainable features and GHG � <br /> emissions with respect to the goals and recommended <br /> � actions of the state's Climate Change Scoping Plan and the <br /> City's guidance and IHSP policies. <br /> ___.. ... <br /> � :,� . ;,... ���� <br /> 5.7 Hazards and Hazardous Materials � ���� � - <br /> Context: To assess whether the Project would have project-level <br /> The IHSP EIR would have desaibed ' �mpacts or contribute to any cumulative impact,ESA will: <br /> the IHSP hazards and hazardous ' <br /> matenals setting that would also apply ! • Describe earthwork activities that would encounter � <br /> to the Project,specifically information ''' underlying materials on the project site,use of hazardous ; <br /> regarding,generally(at a program materials during construction,and potential accidental I <br /> level),earthwork activities that would release conditions during Project operations. <br /> encounter underlying materials,any ` . Describe any specific clean-up activities required for the <br /> legacy contaminants in the IHSP area;. a project site. <br /> • Discuss the Project relative to clean-up goals and poliaes <br /> identified in the IHSP. <br /> � <br /> '? « Evaluate hazards and hazardous matenals effects related <br /> to construction and operation of the Project. <br /> ; • As appropriate,identify project-level mitigation measures <br /> to address hazards and hazardous materials,specifically <br /> ' from project and site-specific requirements or ' <br /> � recommendations in a Project-specific phase 1 report � <br /> i prepared by a qualified consultant of the pro�ect sponsor. <br /> _ _�........ ...__ __�� _. <br /> __.. __�__ _....._.w _ _.. ...__ _. �� .��_ <br /> REV:06-15-15 VR <br /> Page 12 of 18 <br /> ATTY/AGR.Amend No. 2/ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.