My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C r�kr: <�a� <br /> �� ?°a i. .`, 3 c,zy �r. � =�'r'A , C '., E.,.,. ta r t,a. <br /> , •r <br /> "+"... . . .'..,,u . ...&.2,.:� "�^� ..�7���1. .Cs.: ".�,'� ... � .. <br /> � �..�3'+,..: bv. f <br /> ; • Based on measures identified in the IHSP EIR,identi <br /> and discuss the adequacy of specific project-level <br /> measures proposed to handle contaminated soil and � <br /> ' groundwater,if present,and describe measures to reduce <br /> E the risk of exposure to workers onsite as well as potential <br /> ' vapor intrusion into Project. <br /> _ _ _._ _. __� <br /> 5.8 Hydrology and Water Quality <br /> Context To assess whether the Project would have project-level <br /> The IHSP EIR would have described impacts or contribute to any cumulative impact,ESA wilL• � <br /> the IHSP hydrology and water qualiiy ; . Discuss surface hydrology of the project site,identiiying � <br /> setting that would also apply to the significant drainage features and facilities,100 year flood <br /> Project,specifically information zone areas,local storm water collection infrastructure <br /> regarding surface hydrology(drainage c �Ning the area. <br /> patterns,features and faalities);the i <br /> change in the proportion of impervious * Describe and discuss areas of existin�groundwater <br /> surfaces and storm water runoff contamination relative to the project site. � <br /> volumes with implementation of the � . Evaluate the Project for storm water runoff,induding <br /> IHSP,and the possibility offlooding ; im ervious surface calculations,natural treatment � <br /> during 100-and 500-year storm events. approaches,and mitigation best management prac6ces. <br /> [ <br /> � • Discuss Project land uses with and potential effects to the <br /> � Bay and Redwood Creek. <br /> i • Summarize sea level rise baseline information and,as <br /> applicable from the IHSP or Project plans,potential <br /> adaptation measures relative to the project site. I <br /> � • Discuss the Project relative to restoration goals and policies � <br /> identified in the IHSP. � <br /> � As appropriate,identify project-level mitigation measures to � <br /> address hydrology and water quality effects,based on any ? <br /> program-level mitigation measures identified in IHSP EIR. <br /> _. _____ _ _.._.. _ __ _ <br /> 5.9 Land Use and Planning <br /> Context: To assess whether the Project would have project-level <br /> The IHSP EIR would have described ' impacts or contribute to any cumulative impact,ESA will: <br /> the IHSP land use setting that would ; . Discuss the proposed land use change that would occur <br /> aiso apply to the Project,sPeafically with the Project and relation to existing adjacent land uses ' <br /> information regarding existing and and the IHSP. � <br /> proposed land uses,potential land use <br /> conflicts,as well as land use ': * Discuss the ProjecYs consistency with IHSP and other <br /> applicable land use policies and applicable General Plan policies relevant to environmental <br /> development guidance. ; effects. <br /> _ _......... � ,, .._.... _ M�______. �.__.._� <br /> 5.10 Noise <br /> <�E.. <br /> Context: `To assess whether the Project would have project-level <br /> The IHSP EIR would have described � �mpacts or contribute to any cumulative impact,ESA will: �Assumptions: <br /> the IHSP noise setting that would also 3 . Describe the existing noise environment at the project site. � <br /> apply to the Project,specifically i • No new long-term or short- <br /> information regarding the existin� "' � Discuss the noise levels likely to be generated by the 3 term noise measurements <br /> noise environment existing sensitive ; construction equipment used to develop the Pro�ect. 3 will be taken. <br /> receptors within the IHSP area{based ` , Describe tential noise that ma result from tential <br /> on long-term and sho�t-term noise � P° y P° I <br /> measurements),existing noise- changes in the use and intensity of land use with the <br /> generating uses around the project Project. <br /> site,and potential short-term and long- '' . Calculate the change in nase levels due to baseline plus <br /> term noise effects that could result with : <br /> REV:06-15-15 VR <br /> Page 13 of 18 <br /> ATTY/AGR.Amend No. 21ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.