My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2013 1:28:45 PM
Creation date
9/11/2013 4:27:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> mitigation fund established to pay for the reimbursement for <br /> cost of this improvement(estimated,based improvement costs <br /> on this EIR,to be 41 percent)at the time of that exceed the <br /> issuance of a building permit or,if the City applicanYs fair share. <br /> adds the improvement to its Traffic Impact Refer to Precise <br /> Fee Program(TIF)project list,the Plan, Chapter III, <br /> proposed project would mitigate its Capital <br /> contribution to this impact by paying its Improvements. <br /> Traffic Impact Fee in effect at time of <br /> payment and issuance of a building permit. <br /> ApplicanYs full funding or construction of <br /> the improvement,subject to potential <br /> reimbursement as provided in the Precise <br /> Plan,would also mitigate the projecYs <br /> contribution to this impact. <br /> or <br /> Mitigation 7-8(b). Mitigation of the Applicant fair share or City Prior to building <br /> projecYs impact at the intersection of payment of Traffic permit issuance that <br /> Charter Street and Bay Road would require Impact Fee would result in <br /> the conversion of the all-way stop 1,370,785 total <br /> controlled unsignalized intersection to a square feet in <br /> single-lane roundabout. Standard Precise Plan Blocks <br /> roundabouts are at least 110 feet in A-E. Refer to <br /> diameter. Smaller roundabouts may Stanford Precise <br /> operate efficiently down to 80 feet in Plan, Chapter IV, <br /> diameter. The existing intersection at Intersection <br /> Charter Street and Bay Road would allow Improvements Table. <br /> up to an 80-foot-diameter roundabout. If <br /> the design work shows that the 80-foot- If,at the time this <br /> diameter roundabout would not require the improvement is <br /> acquisition of additional right-of-way and required,the <br /> would not create additional safety hazards improvement has not <br /> for motorists, pedestrians,or bicyclists yet been constructed <br /> compared to Mitigation 7-8(a),and if and the City <br /> substantial evidence at the time the determines that other <br /> roundabout is proposed shows that the development has not <br /> roundabout would not divert traffic to other yet significantly <br /> intersections,the roundabout shall be contributed to the <br /> considered feasible and may be substituted need for the <br /> for Mitigation 7-8(a). With this improvement,then <br /> improvement,the level of service(LOS)at the applicant shall <br /> this intersection would improve to an fully fund or construct <br /> acceptable LOS B during the AM peak hour the improvement, <br /> and LOS C during the PM peak hour. subject to potential <br /> Page 6 v r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.