EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> contribution to a signii►cant cumulative Traffic from the proposed project could add Intersection <br /> impact. up to 6.7 seconds to the AM peak hour Improvements Table. <br /> delay at this intersection over Cumulative <br /> No Project conditions(see EIR Table 7.16); <br /> other Cumulative growth could add up to <br /> 89.8 seconds to the delay over Near Term <br /> No Project conditions. The proposed <br /> project would contribute its fair share to a <br /> mitigation fund established to pay for the <br /> cost of this improvement(estimated,based <br /> on this EIR,to be 7 percent)at the time of <br /> issuance of a building permit or,if the City <br /> adds the improvement to its Traffic Impact <br /> Fee Program(TIF)project list,the <br /> proposed project would pay its Traffic <br /> Impact Fee in effect at time of payment and <br /> issuance of a building permit. <br /> The proposed projecYs payment of its fair <br /> share toward these improvements would <br /> mitigate the projecYs contribution to the <br /> cumulative impact to a less-than- <br /> si nii►cant level. <br /> Impact 7-18: Cumulative With Project Mitigation 7-18. To mitigate the Applicant fair share or City; Menlo Park Prior to building <br /> Impact on Marsh Road/Scott Drive cumulative impact at the intersection of payment of Traffic permit issuance that <br /> Intersection. Under Cumulative With Project Marsh Road and Scott Drive,the Impact Fee would result in <br /> conditions during the PM peak hour,the eastbound approach of Scott Drive would 893,810 total square <br /> intersection,would remain at LOS F and the need to be restriped to include a total of feet in Precise Plan <br /> proposed project could contribute up to 14.4 one shared through/left-turn lane and one Blocks A-E. Refer to <br /> seconds of delay. The intersection of Marsh right-turn lane. (Marsh Road is considered Stanford Precise <br /> Road/Scott Drive is located in the City of north-south and Scott Drive is considered Plan, Chapter IV, <br /> Menlo Park. According to City of Menlo Park east-west.) With these improvements,the Intersection <br /> guidelines,this constitutes a cumulatively level of service(LOS)at this intersection Improvements Table. <br /> considerable contribution to a signii►cant would remain an unacceptable LOS F <br /> cumulative impact. during the PM peak hour. Although the <br /> LOS F still exceeds the City of Menlo Park <br /> LOS standard,the LOS under Cumulative <br /> With Project conditions would be better <br /> than that under Cumulative No Project <br /> conditions. <br /> Traffic from the proposed project could <br /> contribute up to 14.4 seconds to the PM <br /> delay at this intersection over Cumulative <br /> No Project conditions(see EIR Table 7.16); <br /> other Cumulative growth could add up to <br /> 74.4 seconds to the delay over Near Term <br /> No Pro�ect conditions. The ro osed <br /> Page 14 �4 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />