My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2013 1:28:45 PM
Creation date
9/11/2013 4:27:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> • Temporary Barriers. Construct solid <br /> plywood fences around construction <br /> areas to shield residences,operational <br /> businesses,or noise-sensitive land <br /> uses. <br /> • Temporary Noise Blankets. Temporary <br /> noise control blanket barriers should be <br /> erected,if necessary,along building <br /> facades or around construction areas. <br /> This mitigation would only be <br /> necessary if conflicts occurred which <br /> were irresolvable by proper scheduling. <br /> (Noise control blanket barriers can be <br /> rented and quickly erected.) <br /> • Noise Disturbance Coordinator. The <br /> City shall require project designation of <br /> a"Noise Disturbance Coordinator"who <br /> would be responsible for responding to <br /> any local complaints about construction <br /> noise. The Disturbance Coordinator <br /> would determine the cause of the noise <br /> complaint(e.g.,starting too early,bad <br /> muffler,etc.)and institute reasonable <br /> measures to correct the problem. <br /> Conspicuously post a telephone <br /> number for the Disturbance <br /> Coordinator at the construction site and <br /> include it in the notice sent to <br /> neighbors regarding the construction <br /> schedule. (The project sponsor could <br /> be responsible for designating a Noise <br /> Disturbance Coordinator,posting the <br /> phone number,and providing <br /> construction schedule notices;the <br /> Noise Disturbance Coordinator would <br /> work directly with an assigned City staff <br /> member. Alternatively,the Noise <br /> Disturbance Coordinator could be <br /> employed by the City and funded by <br /> the applicant.) <br /> • Temporary Closure or Relocation of <br /> Child Care Center. If the project <br /> construction sequencing results in <br /> major outdoor construction activities <br /> occurring adjacent to the child care <br /> center after it is in o eration,then the <br /> Page 28 28 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.