My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2013 1:28:45 PM
Creation date
9/11/2013 4:27:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> project sponsor,at its option,shall <br /> either temporarily close or relocate the <br /> child care center. <br /> Although implementation of these <br /> measures would reduce construction noise <br /> impacts, it is likely that this large project <br /> would be constructed in phases over a long <br /> period of time,subjecting nearby sensitive <br /> receptors to repeated construction noise. <br /> Therefore,the construction noise impact of <br /> the proposed project is considered <br /> si nii►cant and unavoidable. <br /> Impact 13-3: Project-Facilitated Mitigation 13-3. Reduce ground borne Applicant City Prior to grading <br /> Groundborne Vibration Levels. Project- vibration levels during individual, location- permit issuance; <br /> facilitated demolition and construction specific future project demolition and prior to building <br /> activities could generate substantial vibration construction periods by incorporating permit issuance;field <br /> (e.g.,from potential pile driving)in the project conditions in individual project demolition verify implementation <br /> vicinity. These possible intermittent and and construction contractor agreements during grading and <br /> short-term effects represent a potentially that stipulate the following groundborne construction <br /> significantimpact. vibration abatement measures: <br /> • Restrict vibration-generating activity to <br /> between the hours of 7:00 AM and 7:00 <br /> PM,Monday through Friday. Prohibit <br /> such activity on weekends and <br /> holidays. <br /> • If pile driving is proposed, prepare a <br /> vibration study. If the vibration study <br /> shows that pile driving, including <br /> mitigation such as pre-drilling of pile <br /> holes,would cause vibration exceeding <br /> 0.5 inches/sec ppv for structurally <br /> sound buildings designed to modern <br /> engineering standards or 0.2 <br /> inches/sec for structurally sound <br /> buildings for which structural damage is <br /> a major concern,then pile driving shall <br /> not be conducted. <br /> Implementation of these measures would <br /> reduce this potential intermittent and short- <br /> term project vibration impact to a less- <br /> than-significant level. <br /> Page 29 29 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.