Laserfiche WebLink
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> recover micro vertebrate fossils. If <br /> significant fossils are found and collected, <br /> they shall be prepared to a reasonable <br /> point of identification. Excess sediment or <br /> matrix shall be removed from the <br /> specimens to reduce the bulk and cost of <br /> storage. Itemized catalogs of material <br /> collected and identified shall be provided to <br /> a museum repository with the specimens. <br /> Significant fossils collected during this <br /> work,along with the itemized inventory of <br /> these specimens,shall be deposited in a <br /> museum repository for permanent curation <br /> and storage. A report documenting the <br /> results of the monitoring and salvage <br /> activities,and the significance of the <br /> fossils, if any,shall be prepared.The report <br /> and inventory,when submitted to the lead <br /> agency,shall signify the completion of the <br /> program to mitigate impacts on <br /> paleontological resources. <br /> Implementation of these measures would <br /> reduce this impact to a less-than- <br /> signii►cant level. <br /> GEOLOGYAND SOILS <br /> Impact 15-1: Geotechnical Hazards Mitigation 15-1. As recommended by the Applicant City Prior to grading <br /> Associated with Project Excavation and projecYs preliminary geotechnical permit issuance; <br /> Grading. The projecYs proposed excavation investigations,prior to City issuance of prior to building <br /> and grading activities have the potential to grading permits for individual project permit issuance;field <br /> destabilize existing buried utilities and construction phases,the applicant shall be verify implementation <br /> building foundations,or to create conditions required to retain a registered engineering during grading and <br /> that would potentially compromise the safety geologist or geotechnical engineer to construction <br /> or stability of proposed project improvements. prepare detailed,design-level geotechnical <br /> The project applicanYs preliminary investigations to guide the design of all <br /> geotechnical investigations(Lowney Reports project grading and excavation activities. <br /> I and II;and Cornerstone Earth Group, March The detailed,design-level geotechnical <br /> 2008)made initial assessments of these investigations shall be performed for each <br /> conditions, but a design-level geotechnical of the structures proposed for the <br /> investigation will be needed to adequately development site. Subsurface conditions <br /> address all grading and excavation activities shall be explored and laboratory tests <br /> on the development site. Without such a conducted on selected soil samples to <br /> study--and without the associated supervision establish strength parameters for the <br /> of an engineering geologist or geotechnical design of excavations, retained slopes and <br /> engineer during project grading and fill placement,and to determine the <br /> construction--the safety and long-term corrosive potential of both Bay mud and <br /> stabilit of existin and ro osed ro�ect imported fill on foundation elements and <br /> Page 32 32 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />