Laserfiche WebLink
7.1.H. - Page 3 <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City has determined that the 2013-2014 Water <br />Main Replacement Project meets the California Environmental Quality Act (CEQA) <br />exemption criteria as set forth in Section 15302(C) (replacement or reconstruction of <br />existing utility system and/or facilities involving negligible or no expansion of capacity). <br />Furthermore, this project has been designed compliant with the city's Engineering <br />Standards and accepted practices. <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br />exempts projects to update existing lines and facilities. However, the proposed <br />construction will employ stormwater pollution prevention best methods and practices. <br />HARRIS SIDDIQUI <br />ASSISTANT ENGINEER II <br />BILL EKERN <br />COMMUNITY DEVELOPMENT DIRECTOR <br />ROBERT B. BELL <br />CITY MANAGER <br />ATTACHMENTS <br />1. Project Area Map <br />RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br />1. Contract Documents <br />2. Bid Documents <br />