Laserfiche WebLink
APPENDIX A: MITIGATION MONITORING AND REPORTING PROGRAM <br />Mitigation Nle.asufe - — - <br />Ir <br />Implementation! <br />Monitoring lEmIty <br />knplemantatlon <br />Monitoring Method <br />Scheduto <br />1) Proper disposal of household and commercial chemicals <br />2) Proper use of landscaping chemicals <br />3) Clean-up and appropriate disposal of yard cuttings and leaf <br />litter <br />4) Prohibition of any washing and dumping of materials and <br />chemicals into storm drains <br />5) Proper maintenance of bioswales and a discussion of why <br />the bioswales are in place and how they are important to <br />maintaining the project site <br />Mitigation Measure Hydrology -4: The applicant shall be responsible for proper <br />Planning, Housing, and <br />Planning, Housing, <br />Prior to final <br />maintenance of drainage structures, filtration units, and equipment on the project <br />Economic Development <br />and Economic <br />building permit <br />site. <br />Department; Building, <br />Development <br />sign off and <br />Infrastructure, and <br />Department; <br />occupancy of the <br />Transportation Department; <br />Building, <br />first residence <br />City Attorney; and <br />Infrastructure, and <br />biological consultant to <br />Transportation <br />review CC&Rs <br />Department; City <br />Attorney, and <br />biological <br />consultant <br />Mitigation Measure Hydrology -5: The applicant or its contractor shall prepare a <br />Building, Infrastructure, and <br />Building, <br />Prior to issuance <br />Spill Contingency and Countermeasures Plan (SCCP) that describes prevention <br />Transportation Department <br />Infrastructure, and <br />of building <br />measures and response measures for spills of hazardous materials. The SCCP shall <br />to confirm that the RWQCB <br />Transportation <br />permits <br />be submitted for the review and approval of the Regional Water Quality Control <br />has reviewed and approved <br />Department <br />Board. The applicant shall comply with all recommendations presented in the <br />the SCCP <br />approved SCCP at all times. At a minimum, the SCCP shall include: <br />a) Written descriptions of any spills occurring within the past year, <br />corrective actions taken, and plans for preventing their reoccurrence. <br />b) A prediction of the direction, rate of flow, and total quantity of <br />hazardous materials that could be discharged where experience <br />indicates a potential for equipment failure. <br />Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />v <br />A <br />0 <br />