My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A: MITIGATION MONITORING AND REPORTING PROGRAM <br />Mitigation McMorn lrnplemenlatior l <br />Monitoring Entity <br />ImpJemenlatton <br />Monitoring Mothod <br />Stlhedule <br />Mitigation Measure Public Services and Utilities -2; Prior to building permit Building, Infrastructure, <br />Prior to building <br />Building, <br />issuance, the applicant shall perform an engineering study to determine whether and Transportation <br />Infrastructure, and <br />permit issuance <br />sufficient water supply would be available to the project to meet the minimum Department and the Fire <br />Transportation <br />firefighting requirements of the Fire Department. The engineering study shall be Department to review <br />Department and the <br />submitted for the review and approval of the Building and Engineering Departments, as and approve the <br />Fire Department <br />well as the Fire Department. If it is determined that sufficient water supply is not engineering study <br />available for the proposed project, then the study shall outline the infrastructure <br />improvements that would be necessary in order to achieve the Fire Department's <br />minimum water supply requirements. The plans for infrastructure improvements, if <br />required, shall be submitted for the review and approval of the Building and <br />Engineering Departments and the Fire Department. The applicant shall be responsible <br />for the construction and cost of such infrastructure improvements. <br />Mitigation Measure Public Services and Utilities -3: The applicant shall notify the <br />Building, Infrastructure, <br />Building, <br />First notice one <br />owners of the existing homes on Laurel Way at least one month prior to utility <br />and Transportation <br />Infrastructure, and <br />month prior to <br />interruption caused by the disconnection and reconnection of electric, telephone, cable <br />Department to confirm <br />Transportation <br />interruptions in <br />TV, water, and natural gas service. An additional reminder notice shall be given 48 <br />that proper notices have <br />Department <br />utility services; <br />hours in advance of the disconnection. If the interruption to electric service will last <br />been delivered <br />second notice 48 <br />longer than two hours, then the applicant shall be responsible' for providing temporary <br />hours prior to <br />power to the two existing residences. The applicant shall make all reasonable efforts to <br />interruption <br />minimize the interruption of utility service to these two residences. <br />Mitigation Measure Public Services and Utilities -4: The applicant shall work with <br />Building, Infrastructure, <br />Building, <br />Prior to final <br />local solid waste collection services to establish a trash and recycling waste collection <br />and Transportation <br />Infrastructure, and <br />building permit <br />service for the project site. If available, this collection service shall also include <br />Department to confirm <br />Transportation <br />sign off and <br />composting bins and/or yard waste collection and recycling. <br />that service has been <br />Department <br />occupancy of the <br />established <br />first residence <br />Mitigation Measure Public Services and Utilities -5: The applicant shall comply with <br />Building, Infrastructure, <br />Building, <br />Prior to building <br />all water conservation techniques included in the PD statement, including: <br />and Transportation <br />Infrastructure, and <br />permit issuance <br />a) Landscaping shall emphasize native trees, grasses, and drought <br />Department and City <br />Transportation <br />tolerant vegetation; <br />Arborist to review and <br />Department and <br />b) Residences shall use recirculating hot water/structured plumbing <br />approve building and <br />landscaping plans <br />City Arborist <br />systems; and <br />c) Residences shall use home resource monitoring systems for use of <br />a <br />water, electricity, and gas. <br />Z <br />v <br />Laurel Way Planned Development Revised Final EIR A - <br />February 2013 J�l <br />
The URL can be used to link to this page
Your browser does not support the video tag.