Laserfiche WebLink
8.A. - Page 139 <br />APN 057-301-270 <br />3;60 <br />31900 SF <br />APN 057-301-280 <br />3,750 SF <br />3,900 SF <br />APN 057-301-290 <br />APN 057-301-300 <br />APN 057-301-310 <br />4,620 SF <br />3,900 SF <br />APN 057-301-320 <br />4.860 SF <br />4,500 SF <br />APN 057-301-880 <br />3 735 SF <br />3,500 SF <br />APN 057-301-870 <br />4,545 SF <br />4,500 SF <br />APN 057-301-820 <br />5,120 SF <br />4,500 SF <br />APN 057-301-810 <br />3;240 SF <br />3,300 SF <br />APN 057-301-800 <br />4,095 SF <br />Not part of PD <br />APN 057-301-790 <br />3,330 SF <br />Not part of PD <br />APN 057-301-380 <br />3,330 SF <br />3,600 SF <br />APN 057-301-390 <br />3,420 SF <br />3,600 SF <br />APN 057-301,400 <br />3,555 SF <br />3,600 SF <br />APN 057-301-410 <br />3,690 SF <br />3,600 SF <br />APN 057-301-420 <br />3,465 SF <br />3,600 SF <br />APN 057-301-430 <br />Total proposed floor area <br />Average residence size <br />3,960 SF <br />71,365 SF <br />3,90 SF <br />3,600 SF <br />61,400 SF <br />3,838 SF <br />The purpose of the master PD permit is to establish the regulatory framework for future <br />development within the project area, including the following topics: <br />Dedication of public access easements over portions of private property, <br />i.e. individual lots, to accommodate the private road widening, public <br />ingress and egress, and emergency vehicle access, and public <br />improvements, such as utilities <br />Creation of a private conservationldrain age easement across the rear of <br />the three parcels proposed to be merged (APNs 057-301-290, -300, -310) <br />to encompass the existing drainage channel on the site <br />Establishing maximum floor area ratios for the 16 parcels within the <br />approximately 4.75 -acre project area, each of which is subject to an <br />individual Planned Development permit <br />The master Planned Development permit is documented in the attached Planned <br />Development Permit Resolution (Attachment 2). Within this document there are specific <br />conditions of approval that address several key issues raised during the review of this <br />project, such as house sizes, improvement agreements, performance bonds, and <br />mitigation measures. Given the existing site conditions, the lack of a master developer, <br />and the phasing of development (i.e. the need to construct all project -related <br />infrastructure prior to the construction of any new residence) it is imperative that the <br />conditions of approval are comprehensive, protect the general welfare of the City, and <br />ensure orderly development. <br />The project involves two phases: Under Phase I, the scope of work would include the <br />construction of the roadway, utility, and drainage improvements would be performed as <br />