My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 140 <br />part of Phase I of the project, as would the planting of all proposed replacement trees in <br />the private street along the shared side property lines between lots, and in the proposed <br />bioswale and drainage areas. Phase I improvements also include the construction of the <br />new paved private street, drainage infrastructure, utilities. which include sewer <br />connections to the County's sewer system, retaining walls, and landscaping would <br />occur during a period of one construction season (summer/fall). <br />Phase II of the project would include the construction of the individual residences. <br />Phase II cannot commence until Phase I has been completed to the satisfaction of the <br />Community Development Director. In this second phase the individual Planned <br />Development permits would be reviewed by staff and granted by the Zoning <br />Administrator, since the lots are under an acre in size. <br />The City's past practice, for residential subdivisions involving Planned Development <br />permits has been to grant comprehensive PDs (master) for the entire project area. The <br />master PD would cover items such as roadways, common area improvements, utilities, <br />landscaping, and in some cases residential buildings. Where master PDs have not <br />addressed building design the City would then require a subsequent PD(s) prior to <br />allowing the construction of either individual residences or groups several residences <br />within the project area. This practice was commonplace in the build -out of Redwood <br />Shores where a developer would typically be granted a Master PD, with a range of <br />house sizes and floor plans with varying exterior finishes. Then either that developer or <br />a separate builder would apply for the individual PDs in groups or phases. <br />Following the build -out of a Planned Development permit, additions or modifications <br />would be subject to a Planned Development Amendment, pursuant to Article 46, <br />Section 46.10. <br />Revised Final EIR and Errata <br />The previously identified deficiencies have been corrected and the EIR has been <br />revised to reference the 2011 project (see Revised Final EIR under separate cover). <br />The responses to some of the comments have been modified as well and are reflected <br />in the Revised Final EIR. <br />Chapter 4 (Revisions and Errata) of the Revised Final EIR, summarizes text revisions <br />and errata to the Draft EIR. Some changes to the project description and environmental <br />analysis were made in response to public comments. Revisions include some changes <br />in the project description section regarding permits needed and clarifications to <br />mitigation measures. Neither the comments received nor the responses to those <br />comments introduce significant new information that was not addressed or evaluated in <br />the Draft EIR. No substantial revisions that would require recirculation of the Draft EIR, <br />as defined by 15073.5(b) of Title 14 of CEQA, were made to the project or analyses <br />after public comment. This chapter also reflects edits to the mitigation measures, <br />particularly Geology -1 and Geology -2, as directed by the City Council. These two <br />mitigation measures contained qualifying language that the mitigation measures be <br />implemented "to the extent feasible". This specific language has been stricken from all <br />mitigation measures. The other problem that needed to be addressed in the Final EIR is <br />the incorrect data in Appendix C. This appendix cited the building square footage of <br />other residences in the vicinity of the Laurel Way project. It was determined that the <br />
The URL can be used to link to this page
Your browser does not support the video tag.