My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.D. - Page 5 <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />The specific tasks needed to complete Revised Addendum No. 2 are described below. <br />Task 1. Identify Project Changes <br />Task 1 includes a three-step process. Consultant will review the revised Pete's Harbor <br />proposal --including project plans, descriptive text, and any applicant -supplied technical <br />studies --against the previous Addendum No. 2 project, both quantitatively and <br />qualitatively. This step will enable Consultant to revise the project description and to <br />gauge which impacts might change, and to what extent, in the Revised Addendum. <br />Consultant will compare the revised proposal with the Pete's Harbor component <br />addressed in the certified 2003 Marina Shores Village EIR. <br />Consultant will compare these changes to the total Marina Shores buildout potential <br />(the combined Pete's Harbor and Peninsula Marina components) analyzed in the 2003 <br />EIR, the Peninsula Park buildout potential evaluated in the 2007 Peninsula Park <br />Addendum, and the actual One Marina project under construction on the Peninsula <br />Park site. The CEQA findings for each of these interrelated development scenarios will <br />provide substantial evidence for the Revised Addendum No. 2 findings. The <br />groundwork for this second step was already established during preparation of <br />previous Addendum No. 2. <br />Chapter 2 (Proposed Project Changes) of Revised Addendum No. 2 will identify the <br />changes between the current Pete's Harbor project and the Pete's Harbor <br />component addressed in the certified 2003 EIR. <br />Task 2. Prepare Administrative Draft EIR Revised Addendum No. 2 <br />The foundation for Task 2 was already established during preparation of previous <br />Addendum No. 2. <br />Consultant will prepare the Administrative Draft EIR Revised Addendum No. 2 with text, <br />graphics, and comparative tables which clearly describe: (1) the project changes as <br />described in Task 1; and (2) whether the certified 2003 EIR with modifications <br />adequately addresses the current Pete's Harbor project or if there are substantive new <br />impact concerns or mitigation needs not considered in the 2003 EIR. For each <br />environmental topic considered in the 2003 EIR, the Administrative Draft will <br />summarize how the project revisions, as well as any relevant changes in environmental <br />conditions and CEQA requirements since 2003, affect each impact and mitigation <br />finding, and whether there are any new or substantially more severe impact or <br />mitigation findings not considered in the 2003 EIR. <br />REV: 09-05-13 VR <br />ATTY/AGR/2013/AMENDMENTS/AMEND NO. 1 MIG PETE'S HARBOR <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.