My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. 1. D. - Page 6 <br />The Administrative Draft Revised Addendum will contain only the information <br />necessary to make the 2003 EIR adequate for the project as revised, so that the <br />reader can clearly identify new information; the Revised Addendum will not be <br />redundant. <br />For the Revised Addendum, Consultant will replace all project plan graphics in the <br />previous Addendum with the most current corresponding project plans supplied by the <br />applicant. Please note that the applicant has not revised the Shade Analysis diagrams <br />(Plan Sheets A-12.1 and A-12.2, which are dated Sept. 20, 2012). Because the project <br />site plan has changed (although slightly), Consultant's suggest that the applicant <br />prepare revised Shade Analysis diagrams for consistency with the most recent site <br />plan. <br />Although not anticipated, if the CEQA evaluation reveals a new significant <br />environmental impact or a substantial increase in the severity of a previously identified <br />significant impact, or if a new mitigation measure is required which is considerably <br />different from those identified in the 2003 EIR, Consultant will inform the City <br />immediately to discuss how to proceed (e.g., Addendum with further project <br />modifications, Mitigated Negative Declaration, Supplemental EIR). <br />Ten (10) copies plus an electronic copy of the Administrative Draft will be provided to <br />City staff. <br />Task 3. Prepare Screencheck EIR Revised Addendum No. 2 <br />The foundation for Task 3 was already established during preparation of previous <br />Addendum No. 2. <br />Consultant will prepare a Screencheck Revised Addendum based on: (1) City staff <br />concurrence that the Administrative Draft findings are consistent with CEQA <br />Guidelines section 15164 (Addendum to an EIR or Negative Declaration)--i.e., an <br />Addendum does represent the proper CEQA approach; and (2) comments from City <br />staff on the Administrative Draft. Prior to publication, an electronic version of the <br />Screencheck will be provided to City staff for final review and approval. <br />Task 4. Prepare Published EIR Revised Addendum No. 2 <br />Based on City staff comments/approval of the Screencheck, Consultant will make <br />necessary final revisions to complete the Revised Addendum, and thirty (30) copies <br />plus an electronic version of the published Revised Addendum will be delivered to <br />the City. <br />Task 5. Attend Workshops, Meetings, and Hearings <br />Consultant will attend up to: (a) two (2) public workshops, (b) two (2) meetings with <br />City staff to discuss the Revised Addendum, and (c) four (4) Planning Commission <br />and/or City Council hearings. At the workshops and hearings, Consultant will assist <br />City staff in presenting the Revised Addendum and answering questions. <br />REV: 09-05-13 VR <br />ATTY/AGR/2013/AMENDMENTS/AMEND NO. 1 MIG PETE'S HARBOR <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.