My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-10-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-10-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:12:48 PM
Creation date
10/3/2013 5:33:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/7/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.D. - Page 33 <br /> CONSULTANT will utilize the FREQ model to present the following measures of effectiveness <br /> for the AM and PM peak hours: vehicle density, level of services, travel time, travel speed, <br /> bottlenecks, and queuing at on-ramps. <br /> Subtask 3.6.3 -Design Year <br /> CONSULTANT will include No Build and preferred alternative. CONSULTANT will include <br /> No Build and 2 preferred alternatives in the construction year analysis. CONSULTANT will <br /> analyze the AM and PM peak hour traffic design year conditions for the 13 intersection study <br /> locations. The measures of effectiveness evaluated for the isolated intersections will include <br /> average vehicle delay, level of services and queuing. <br /> For the intersections along the Woodside corridor, the measures of effectiveness drawn from the <br /> SimTraffic model for the AM and PM peak hours will include: average vehicle delay, level of <br /> service, percent of vehicles (demand) served, and vehicle queuing. Additional measures may be <br /> reported if requested by the PDT or Caltrans functional units. <br /> CONSULTANT will utilize the FREQ model to present the following measures of effectiveness <br /> for the AM and PM peak hours: vehicle density, level of services, travel time, travel speed, <br /> bottlenecks, and queuing at on-ramps. <br /> Subtask 3.6.4-Administrative Draft TOAR <br /> CONSULTANT will prepare an administrative draft TOAR that documents the analyses <br /> described above. The administrative draft will be submitted to the CTTY and PDT for review <br /> and comment prior to circulation of the report to Caltrans functional units. <br /> Subtask 3.6.5-Draft TOAR <br /> CONSULTANT will finalize the draft TOAR and submit to the CITY and Caltrans for review <br /> and comment. Once comments are received from Caltrans, CONSULTANT will review the <br /> comments and prepare initial responses. CONSULTANT will meet with Caltrans Functional <br /> Units to review their comments, describe the responses to address the comments, and resolve any <br /> outstanding technical questions on the analysis. <br /> Subtask 3.6.6-Final TOAR <br /> CONSULTANT will finalize the TOAR, incorporating any necessary changes based on Caltrans <br /> comments, and submit for approval. <br /> Task 3 —Deliverables <br /> ❑ Forecasting & Analysis Methodology Memorandum <br /> ❑ Existing Conditions Memorandum <br /> ❑ Traffic Forecasting Report <br /> ❑ Alternatives Analysis Memorandum <br /> ❑ Pedestrian/Bicycle Quality of Service (P/BQOS) Analysis technical memorandum <br /> ❑ Traffic Operations Analysis Report <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:09-26-13 VR <br /> Page 30 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.