My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-10-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-10-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:12:48 PM
Creation date
10/3/2013 5:33:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/7/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.D. - Page 67 <br /> Cultural Studies <br /> ■ Extended Phase I testing in support of the ASR is not included. <br /> ■ A maximum of eight buildings/structures will be assumed for historic resource evaluation <br /> report. <br /> Visual Impact Studies <br /> ■ A shadow study is not included. <br /> Communit,v Im�act Studies <br /> ■ A detailed Relocation Impact Assessment Report is not included. <br /> Community Outreach <br /> ■ CTTY staff will handle the community meeting noticing and logistics — Newspaper <br /> announcements, e-mail blasts to community groups, securing the meeting facility <br /> ■ Interpretation services at meetings include Spanish only. <br /> Right of WaX <br /> ■ State Right-of-Way Maps will be available from Caltrans. <br /> ■ Right-of-Way delineation will be based on as-built information. No field verification is <br /> proposed at this stage of design. <br /> ■ Right of way hard copy and appraisal maps; temporary construction easements; and legal <br /> descriptions are not included in the scope of services. <br /> ■ Title reports will not be included. <br /> Units <br /> ■ All project deliverables will be prepared in English units. <br /> Drainage/H. d�gY <br /> ■ CONSULTANT will not perform scour analysis for any watercourses in the project area. <br /> ■ Detailed floodplain analysis is not included <br /> Utilities <br /> ■ Utility relocations are for study alternatives only <br /> ■ Utility agreements will not be prepared <br /> Geotechnical <br /> ■ No subsurface exploration or laboratory testing will be performed. <br /> Pavement <br /> ■ Existing pavement does not require any analysis or testing. <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:09-26-13 VR <br /> Page 64 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.