My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-10-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-10-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:12:48 PM
Creation date
10/3/2013 5:33:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/7/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.D. - Page 66 <br /> ■ Caltrans will provide existing survey controL Monuments in the Route 101 right of way are <br /> assumed to be in Caltrans current coordinate system and not require a separate GPS survey to <br /> tie them into adjacent state facilities. <br /> ■ Survey work will be performed during daylight hours, based on an eight hours workday. <br /> Non-Standard Desi�n Exceptions <br /> ■ One (1) mandatory and one (1) advisory Fact Sheet will be prepared for the design <br /> exceptions associated with each of the two Build Alternatives. <br /> Traffic Studies <br /> ■ Accident data for the three years prior to the commencement of this study will be used <br /> ■ Traffic Engineering Performance Assessment(TEPA)is not required <br /> Project Re�ort Process <br /> ■ Preparation of a Supplemental PSR/PDS or separate PSR document is not included. <br /> ■ Caltrans and the CITY will execute a Cooperative Agreement for the PA&ED. Freeway <br /> agreements are not needed at this time. <br /> Environmental Review Process <br /> ■ An IS and routine EA document is assumed in compliance with CEQA and NEPA <br /> requirements. <br /> ■ Caltrans will be the lead agency for CEQA and NEPA. <br /> ■ Up to two build alternatives will be analyzed for environmental effects. <br /> ■ Environmental permit applications are not included in this scope of services. <br /> ■ The project will fall within BCDC jurisdiction. <br /> ■ Caltrans NEPA review of the Draft IS/EA will take place at the Second Administrative Draft <br /> stage. <br /> ■ Comments on the Public Draft IS/EA will not require further environmental studies, <br /> evaluation of additional alternatives, or revisions to technical studies. <br /> ■ Up to 50 public comments will be submitted. <br /> Air Qualitv Studies <br /> ■ The project will require quantitative evaluation in a PM2.5 hot spot analysis. <br /> ■ No new data or analysis will be required to respond to comments on the PM2.5 hot spot <br /> analysis. <br /> Biological Studies <br /> ■ A single season survey will be provided. Surveys over multiple seasons are not assumed. <br /> ■ One field meeting with USACE to review jurisdictional delineation is assumed. <br /> ■ The project is assumed to qualify for Nationwide Permit authorization. NEPA/Section 404 <br /> processing is not included. <br /> ■ Detailed development of mitigation is not included. <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:09-26-13 VR <br /> Page 63 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.