My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-10-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-10-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:12:48 PM
Creation date
10/3/2013 5:33:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/7/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 77 <br /> facilities or services. The California Legislature passed Senate Bill 50 (SB 50)in 1998 to insert new <br /> language into the Government Code (Sections 65995.5-65885.7),which authorized school districts to <br /> impose fees on developers of new residential construction in excess of mitigation fees authorized by <br /> Government Code 66000. SB 50 also restricts the ability of local agencies to deny project approvals <br /> on the basis that public school facilities (classrooms, auditoriums, etc) are inadequate. School <br /> districts must meet a list of specific criteria,including the completion and annual update of a School <br /> Facility Needs Analysis,in order to impose additional fees. <br /> Under SB 50, school districts may collect fees to offset the costs associated with increasing school <br /> capacity as a result of development. Under the terms of this statute,payment of statutory fees by <br /> property owners or property developers is considered to mitigate in full for the purposes of CEQA <br /> any impacts to school facilities associated with a qualifying project. The fees are assessed based <br /> upon the proposed square footage of the new or expanded development. <br /> Implementation of the proposed project would incrementally increase the local resident population <br /> and would subsequently incrementally increase the demand for local school facilities. Based on <br /> student generation rates for the SUHSD,the proposed project would generate approximately one <br /> high school student(grades 9-12).38 <br /> Typically, more elementary and middle school students are generated by residential development <br /> than high school students. The overall increase from the project,however,would make up a minute <br /> percentage of the total student population that would result from planned growth (approximately <br /> 16,000 residents)under the recently adopted Redwood City General Plan. Implementation of the <br /> proposed project would not substantially degrade existing school facilities and would not result in the <br /> need for new permanent school facilities to be constructed. The payment of school impacts fees, <br /> consistent with SB 50,would allow the local school districts to provide sufficient services for <br /> students generated by the project. (Less Than Significant Impact) <br /> 4.14.2.3 Parks <br /> The City has adopted the Parkland Dedication Ordinance (PDO) and Park Impact Ordinance (PIO) <br /> that requires residential developers to dedicate parkland or pay in-lieu fees, or both,to offset the <br /> demand for neighborhood parkland created by their residential developments (Municipal Code <br /> Chapter 30). The project site does not have sufficient land available to make a dedication of <br /> parkland,based on the proposed site plan. The project will be required to pay in-lieu fees pursuant to <br /> the PIO. <br /> The addition of 13 residents39 to Redwood City would not result in accelerated deterioration of local <br /> recreational facilities or the need for new park facilities. The project would incrementally increase <br /> the demand for park services in the vicinity. Payment of in-lieu fees pursuant to the PIO would <br /> offset impacts from the additional use of City parks. (Less Than Significant Impact) <br /> 4.14.2.4 Libraries <br /> Implementation of the proposed project would result in an increase in the permanent population of <br /> the City which would likely result in an incremental increase in patrons at the local libraries. The <br /> addition of up to 13 residents in the City40 would not result in significant increases in usage or <br /> 38 Student generation based upon 02 students per residential unit. Sequoia Union High School District. Email with <br /> Enrique Navas. RE:Student Generation Rates. July 15,20ll. <br /> 39 Based on the City's average persons per household of 2.69. <br /> 40 Based upon 2.69 persons per household(Department of Finance,2010 Census Data). <br /> 1410 Valota Road Residential Project 65 Initial Study <br /> Redwood City January 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.