�1�,•�igation Morrit�ring and Aeporting Plara <br /> cofferdam design shouid be performed by a registered civil en�ineer and submitted to <br /> the City for review prior to constn�ction. <br /> • The site is considered potentially corrosive to reinforcing steel embedded in concrete <br /> structures. A coxrosion engineet should be consulted to adjust the concrete mix <br /> accordingly. <br /> Responsible Party: City of Redwood City oversight <br /> GREENHOUSE GAS EMISSIONS <br /> Mitigation Measute GHG 1: Best Management Practices (BMPs) fot Reducing GHG <br /> Emissions from Co�struction <br /> The City shall encourage the Cantractor ta implement the following BMPs during construction of <br /> the proposed project,where appropriate: <br /> • At least 15 pexcent af the construcrion vehicle fleet shall use alter�ative fuel. <br /> • At least 10 pexcent af the materials used for project constxuction shall be soutced locally <br /> (within 5Q miles of the project site). <br /> • At least 50 percent of the waste generated by project constxuc�ion sl�all be recycled or <br /> reused. <br /> + Use low sulfur fuel fot stationaty construction equipment,to the extent feasible. <br /> • Use e�sring power so�tces (e.g.,power poies) or clean fuel generators ratl�er than <br /> temporar�power generators, to the extent feasible. <br /> � Use low emission on-site stationary equipment,to the extent feasible. <br /> Responsible Party: Cit�r of Redwood City oversight <br /> HYDR4LDGYAND 1�'ATER QUALITY <br /> Mitigation Measute HYD 1: Implementation af BMPs <br /> The Contractor shall prepare a Storm Water Pollution I'tevention Plan {SWPPP) and implement the <br /> BMPs contained in the SWPPP and the NPDES Permit Compliance Checklist (see Appendix I} to <br /> control and pxevent the potential discharge of non-stormwater discharges and pollutants to <br /> Redwood Creek during construction. The Contractor shalZ utilize measures such as sediment <br /> barriers, silt fe�ces,straw wattles,biodegradable fibex rolls,or hpdtaulic mulches to trap sediment in <br /> stormwater runoff duYing construction to prevent the discharge of pollutants to Redwood Creek. <br /> The Contractor sha11 revegetate the disturbed areas of landscaped vegetation along the creek banks <br /> with a hpdroseed native plant mix for slope stabilization. The Contractor shall im}�lement rock <br /> slope protecrion (RSP) on t�e creek bank below tl�e proposed 1$-inch drainage pipes' discha�ge <br /> paints to �revent erosion along the cteek bank. <br /> 1�+I� 3�� ��;l; _�k � US 90 7 Pedestrian Uradercrosring and <br /> Bair Isdand Sto��n i�ater Pump Stataon Project <br />