My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 4:16:25 PM
Creation date
10/22/2013 4:11:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitig�ation Mo�itoring and�orting.Plara <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measu.re HYD 2: Iricreased Height of Creek-side Wall <br /> The height of the creek-side wall ma�require retrofitring if future sea level rise in Rec�wood Creek <br /> results in frequent flooding of the joint-use path during 5- or 10-year storm events. The City shall <br /> monitor sea level rise and retrofit the creek-side wal�when necessary. <br /> Responsible Party: City of Redwaod City <br /> NOISE <br /> Mitigation Measute NOI 1: Construction Scheduling <br /> The Contractor shall ensure that noise-generating construction activity is li.mited to between the <br /> hours of 7:00 AM and 8:00 PM,Monday through Friday, and noise levels generated by construction <br /> axe prol�ibited on Saturdays,Sundays, and holidays (Redwaod City Municipal Code Section�4.30). <br /> Responsible Party: City of Redwood Ciry oversight <br /> Mitigation Measure NOI 2: Constructian Equipmient Mufflers and Maintenance <br /> The Contractor shall equip all internal combust�on engine-driven equipment with intake and exhaust <br /> mufflers that are in good condirion ana designed for the equipment. <br /> Responsible Parry: City of Redwood City oversight <br /> Mitigation Measure NOI 3: Quiet Equipment Selection <br /> The Cantractor shall use quiet construction equipment,particuiarly air compressors,wherever <br /> possible. <br /> Responsible Party: City of Redwooa City oversight <br /> Mitigation Measure NOI 4:Notificarion of Pile Driving <br /> 'The Contractor shaIl provide advanced written norification of the schedule for project pile driving <br /> acrivities ta homes and businesses on the east side of U5 101 within 200 feet of the replacement <br /> pump station site. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 5:Noise Disturbance Coordinator <br /> The City shall designate a "noise distuYbance coordinator" who would be responsible for responding <br /> to any local complaints about construction noise. The distutbance coordinator would determine the <br /> cause of the noise complaint (e.g., starting too early, }�ad muffler,etc.) and institute reasonable <br /> measut�es warranted to coxrect the problem.The telephone number for the distutbance coordinator <br /> shall be posted in a conspicuous locarion at the canstruction site. <br /> Responsilble Party: City of Redwood City <br /> July 15,2013 _1-� US 10�Pede.ctriarr Undercrossing and <br /> Bair I.rland Storm Wlater Pas�StaLaon Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.