Laserfiche WebLink
Mitig�ation Mo�itoring and�orting.Plara <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measu.re HYD 2: Iricreased Height of Creek-side Wall <br /> The height of the creek-side wall ma�require retrofitring if future sea level rise in Rec�wood Creek <br /> results in frequent flooding of the joint-use path during 5- or 10-year storm events. The City shall <br /> monitor sea level rise and retrofit the creek-side wal�when necessary. <br /> Responsible Party: City of Redwaod City <br /> NOISE <br /> Mitigation Measute NOI 1: Construction Scheduling <br /> The Contractor shall ensure that noise-generating construction activity is li.mited to between the <br /> hours of 7:00 AM and 8:00 PM,Monday through Friday, and noise levels generated by construction <br /> axe prol�ibited on Saturdays,Sundays, and holidays (Redwaod City Municipal Code Section�4.30). <br /> Responsible Party: City of Redwood Ciry oversight <br /> Mitigation Measure NOI 2: Constructian Equipmient Mufflers and Maintenance <br /> The Contractor shall equip all internal combust�on engine-driven equipment with intake and exhaust <br /> mufflers that are in good condirion ana designed for the equipment. <br /> Responsible Parry: City of Redwood City oversight <br /> Mitigation Measure NOI 3: Quiet Equipment Selection <br /> The Cantractor shall use quiet construction equipment,particuiarly air compressors,wherever <br /> possible. <br /> Responsible Party: City of Redwooa City oversight <br /> Mitigation Measure NOI 4:Notificarion of Pile Driving <br /> 'The Contractor shaIl provide advanced written norification of the schedule for project pile driving <br /> acrivities ta homes and businesses on the east side of U5 101 within 200 feet of the replacement <br /> pump station site. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 5:Noise Disturbance Coordinator <br /> The City shall designate a "noise distuYbance coordinator" who would be responsible for responding <br /> to any local complaints about construction noise. The distutbance coordinator would determine the <br /> cause of the noise complaint (e.g., starting too early, }�ad muffler,etc.) and institute reasonable <br /> measut�es warranted to coxrect the problem.The telephone number for the distutbance coordinator <br /> shall be posted in a conspicuous locarion at the canstruction site. <br /> Responsilble Party: City of Redwood City <br /> July 15,2013 _1-� US 10�Pede.ctriarr Undercrossing and <br /> Bair I.rland Storm Wlater Pas�StaLaon Project <br />