My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 4:16:25 PM
Creation date
10/22/2013 4:11:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� P�ject Description <br /> The order of work and estimated durations for the construcrion tasks for the storm drain pump <br /> station are as listed as folloWS: <br /> • Mobilization: 3 days <br /> • Clearing and grubbing: 5 days <br /> • Installation of best management pracrices (BMPs): 5 da�s <br /> • Installation of shoring system for wet well construcrion: 10 days <br /> ■ Installarion of wet well and pumps: 40 days <br /> ■ Installation of valve vault,equipment,and communicar�on facilities: 3Q days <br /> • Installation of drainage pipes: 10 days <br /> • Demolition and removal of existing pump station: 5 daps <br /> • Constn�ction of maintenance drivewap: 5 days <br /> • Restoration of site: 5 days <br /> The order of work and esrimated durations for the constnlcrion tasks for the US 101 undercrossing <br /> are below: <br /> • Mobilizarion: 5 days <br /> • Clearing and gtubbing: 5 days <br /> • Installation of BMPs: 5 days <br /> • Installarian of temporary cofferdam: 10 days <br /> • Excavation for wall wark under US 101: 10 days <br /> • Installa�ion of tie backs/shotcrete: 20 days <br /> • Prepaxation and constxuction of bottom slab for pat�: 15 days <br /> • Construction of creek-side retaining wall: 10 daps <br /> - Consttuction of second face of rieback wall: 10 days <br /> - Construction of reta.ining walls and sidewalks beyond path under US 101: 20 days <br /> • Installat�on of railing,lighring, call boxes,ar�d miscellaneous path items: 10 days <br /> # Construction of sidewalk, street trees,and pedestrian lights in City-owned parcel: <br /> 15 days <br /> • Consttuction of scenic overlook: 5 days <br /> - Lar�dscaping: 5 days <br /> - Site restoration: 5 days <br /> 1.5.4 Construction Equipment <br /> Table 1-1 shows the equipment needed far the constxucrion of the proposed project. Construction <br /> of the storsn drain pump starion wouid require the following equipment: <br /> �-{] US 901 Pedestrian Undercro.r.ring astd <br /> ��rtar Islarad Stos rn Drain Pump 5tatian Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.