My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 4:16:25 PM
Creation date
10/22/2013 4:11:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U.S. HIGHWAY 1Q'# PEDESTRIAN UNDERCROSSING AND <br /> BAIR ISLAND ROAD STORM DRAIN PUMP STATION PROJECT <br /> This Initial Study and the proposed Mitigated Negative Declaratian (MNll) assess the potential <br /> environmental impacts of the U.S. Highway 101 Pedestrian Undexcxossin�and Bair Island Road <br /> Storm Drain Pump Starion Project (US 101 Pedestrian Undexcxossing and Bair Island Storm Drain <br /> Pump Starion Project} far use in local planning and decisian making. In compliance with the <br /> California Environmental Quality Act (CEQA), the City of Redwood Cin�(City) decided to prepare <br /> a b'IND for the proposed project because the Inirial Study found that,with the incorporation of <br /> app�opriate mitigation measures, all potential impacts related to the project would be less than <br /> significant. <br /> PROJECT lNFORMATION <br /> Project Tide: U.S. Highway 10� Pedestrian Undercrossing and Bair Island Road Storrr� <br /> Drain Pump Station Project <br /> Lead Agency: City of Redwood City <br /> Community Development Department <br /> 10�7 Middlef�eld Road <br /> Redwood City, CA 94dG4 <br /> Contac#Petson: Tanisha��1erne�,Project Engineer <br /> {G50) 780-73G6 <br /> twerner�?redwoodcit�.org <br /> Project Applicant: Ciry of Redwood City <br /> Ptoject Location: Between Bair Island Road and Convention Way,Redwood City,CA <br /> Existing Genetal Plan Designation: Mixed Use-Corridar,Mi�eed Use-Waterfxont Neighborhood <br /> Existing Zoning: Planned Community District (P) <br /> Description of Projec#: The City of Redwood City proposes to construct a joint-use path under <br /> the U.S. Highway 101 bridge at Redwood Creek. The proposed path, <br /> approximately 700 feet long,would connect a recently constructed bicycle <br /> path on Bair Island Road to the e�sting bicycle path on Convenrion Way. <br /> The phpsical link between�he Bapfront development projects and the <br /> Downtown area would fulfill long-term planning goals. 'I'he proposed <br /> project also incluc�es an extension of the pedestrian path to the City-owned <br /> parcel south of Con�enrion Wap and .� scenic avexlook. <br />
The URL can be used to link to this page
Your browser does not support the video tag.